Skip to main content

Balfour Beatty wins Scottish transport contract

Balfour Beatty has won a £35 million deal by Perth and Kinross Council to deliver the first phase of the Perth Transport Futures Project. Under the terms of the deal, Balfour Beatty will construct a new grade separated junction on the A9 dual carriageway as well as a new link road enabling access to development land to the west of Perth. This is the first of four phases of the Perth Transport Futures project, which aims to reduce congestion, boost transportation in the area and develop the local economy.
August 26, 2016 Read time: 2 mins
1146 Balfour Beatty has won a £35 million deal by Perth and Kinross Council to deliver the first phase of the Perth Transport Futures Project. Under the terms of the deal, Balfour Beatty will construct a new grade separated junction on the A9 dual carriageway as well as a new link road enabling access to development land to the west of Perth. This is the first of four phases of the Perth Transport Futures project, which aims to reduce congestion, boost transportation in the area and develop the local economy.

The works are due to commence in September 2016, with completion expected in the second quarter of 2019.

The contract has been awarded under the Scape Group’s National Civil Engineering and Infrastructure Framework. The aim of this plan is to support growth in Scotland’s third fastest developing region. Balfour Beatty has previously worked on highway infrastructure schemes in the area including the A9, A90 and the M90.

For more information on companies in this article

Related Content

  • Faithful+Gould in England highway efficiencies
    July 8, 2022
    Faithful+Gould - a member of the SNC-Lavalin Group - will deal with issues around safety, congestion and road capacity.
  • Clever approach to reducing bridge vibrations
    November 14, 2013
    Reducing vibrations on a bridge, supplying high-quality binders to emerging countries and helping small and medium players with warm mix, this month’s stories showcase some innovative bitumen technology solutions - Kristina Smith reports The Kessock Bridge in the Highlands of Scotland has become the third bridge in the UK to be resurfaced with Gussasphalt. A dense mastic asphalt containing Nynas Endura N5, a polymer modified binder, Gussasphalt has been designed to have a longer life than standard mastic as
  • UK Government’s green light for new Taunton road link
    May 22, 2013
    Work on a new link road will go ahead in Taunton, western England after receiving final approval from Local Transport Minister Norman Baker. The work is needed to improve east-west connections across Taunton and open up access to new development. The overall US$32.07 million (£22.1mn) scheme will see Somerset County Council construct a new road linking Staplegrove Road in the west of the town to Priory Avenue in the east. “This important scheme will help to reduce traffic demand through the town centre and
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.