Skip to main content

Balfour Beatty wins road contract for Norfolk

Balfour Beatty has been awarded a €147.72 million (£104 million) road scheme by Norfolk County Council to complete works on the Norwich Northern Distributor Road (NNDR). The new road will serve Broadland, Norfolk, and improve access to North Norfolk and Norwich International Airport, with better links to Great Yarmouth and the south of the region. It will also bring relief on congested and unsuitable roads around the north and east of Norwich and improve capacity for future growth in jobs and housing.
November 27, 2015 Read time: 2 mins
1146 Balfour Beatty has been awarded a €147.72 million (£104 million) road scheme by Norfolk County Council to complete works on the Norwich Northern Distributor Road (NNDR). The new road will serve Broadland, Norfolk, and improve access to North Norfolk and Norwich International Airport, with better links to Great Yarmouth and the south of the region. It will also bring relief on congested and unsuitable roads around the north and east of Norwich and improve capacity for future growth in jobs and housing.

Balfour Beatty will construct the new 19.6km dual carriageway, including nine new roundabouts, seven new bridges, an underpass and a more complex two level junction. The new dual carriageway will run from the A1067 Fakenham Road, crossing the A140 at Norwich International Airport and joining the A47 at Postwick, at the eastern end of Norwich Southern Bypass.

Balfour Beatty was awarded the Early Contractor Involvement (ECI) phase of the NNDR scheme in 2009 and has since then been assisting Norfolk County Council with design development, construction feasibility advice and development of the scheme’s target cost. Balfour Beatty is already working on Norfolk County Council’s €38.36 million (£27 million) Postwick junction project which will join the NNDR with the A47 trunk road. Construction work will commence this winter and is scheduled for completion in late 2017.

For more information on companies in this article

Related Content

  • Smart constructioon with GIS, GPS design technology
    May 2, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.
  • Smart constructioon with GIS, GPS design technology
    February 16, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.
  • Ireland road advisory contract award
    December 19, 2023
    An Irish road project advisory contract has been awarded.
  • New road reduces Carlisle congestion by 20%
    May 11, 2012
    Carlisle, in north-west England, has seen as 20% reduction in congestion since the opening of the city’s US$284million (£176m) Northern Development Route in February this year. Around 10,000 vehicles a day are using the new road, which is broadly in line with the predictions made by highways engineers when building a case to construct a new route connecting the A595 with the M6 around the western flank of the city. Traffic counters positioned on the new road show an average of 9,583 vehicles a day along the