Skip to main content

Balfour Beatty wins road contract for Norfolk

Balfour Beatty has been awarded a €147.72 million (£104 million) road scheme by Norfolk County Council to complete works on the Norwich Northern Distributor Road (NNDR). The new road will serve Broadland, Norfolk, and improve access to North Norfolk and Norwich International Airport, with better links to Great Yarmouth and the south of the region. It will also bring relief on congested and unsuitable roads around the north and east of Norwich and improve capacity for future growth in jobs and housing.
November 27, 2015 Read time: 2 mins
1146 Balfour Beatty has been awarded a €147.72 million (£104 million) road scheme by Norfolk County Council to complete works on the Norwich Northern Distributor Road (NNDR). The new road will serve Broadland, Norfolk, and improve access to North Norfolk and Norwich International Airport, with better links to Great Yarmouth and the south of the region. It will also bring relief on congested and unsuitable roads around the north and east of Norwich and improve capacity for future growth in jobs and housing.

Balfour Beatty will construct the new 19.6km dual carriageway, including nine new roundabouts, seven new bridges, an underpass and a more complex two level junction. The new dual carriageway will run from the A1067 Fakenham Road, crossing the A140 at Norwich International Airport and joining the A47 at Postwick, at the eastern end of Norwich Southern Bypass.

Balfour Beatty was awarded the Early Contractor Involvement (ECI) phase of the NNDR scheme in 2009 and has since then been assisting Norfolk County Council with design development, construction feasibility advice and development of the scheme’s target cost. Balfour Beatty is already working on Norfolk County Council’s €38.36 million (£27 million) Postwick junction project which will join the NNDR with the A47 trunk road. Construction work will commence this winter and is scheduled for completion in late 2017.

For more information on companies in this article

Related Content

  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • Tunnelling conference and competition
    September 23, 2019
    The annual tunnelling conference and competition is due to take place in Miami from the 18th-20th November in Miami, Florida. The competition features eight categories and aims to identify the most important ongoing underground works and technologies that help cities change and enable habits and ways of life to evolve in order to build smart and sustainable urba
  • Colombia contract for construction consortium
    December 15, 2016
    Construction work to widen the Autopista Norte highway in Colombia is being handled by the Accenorte consortium. The work involves widening a 4.2km stretch of the highway, which lies to the north of Colombia’s capital Bogota. The project is worth close to US$157 million, with the majority of the funding being delivered by the consortium partners and the remainder from a Colombian Bank. The consortium is led by Mincivil with a 57.43% stake. It also includes Universal with a 16.7% share, Castro Tcherassi with
  • Improved pedestrian safety in Qatar
    July 14, 2015
    Improved pedestrian safety is being achieved in Qatar with the help of new technology. AGD Systems and Qatar-based Traffic Tech Group have joined forces to install pedestrian detection systems. Traffic Tech Group will be AGD’s exclusive global distributor for the Puffin and Toucan pedestrian crossings in the region to increase pedestrian and cyclist safety and improve traffic flows. On-street trials of AGD-enabled Puffin and Toucan schemes commenced in late 2014 at a dual pedestrian crossing on the busy A