Skip to main content

Balfour Beatty awarded €54.01 million A1 improvement scheme

Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
June 5, 2014 Read time: 3 mins
1146 Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England.

The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.

The widening works will include the installation of reinforced earth and concrete walls and the Balfour Beatty patented King Sheet Piling System which will reduce the pile area and pile driving depth associated with traditional methods thereby reducing the overall construction  programme.  Alongside, extensive traffic management plans will allow the installation to be carried out during the day which will reduce noisy working during the night.

The existing merge and diverge arrangements will be reconfigured with the widened A1 carriageway requiring replacing and/or repositioning of fencing, road restraint systems, drainage, traffic signs, road markings, street lighting and technology structures.  Landscaping and accommodation works on the trunk road and local road networks will retain the existing cutting and embankment slopes.

The hardening of the central reserve between Coal House and Lobley Hill will maximise the availability for two lanes of traffic in each direction throughout the duration of the contract, minimising disruption for road users.

Balfour Beatty’s sustainable approach will include excavated material being utilised as part of the reinforced earth structure and verge fill, with existing road pavement planing being reused as the sub-base within the footway construction.  Other excess materials will be taken off site and recycled on construction projects across the north east of England. Additionally, the scheme will employ over 200 people at construction peak including a commitment to three apprentices and two graduates and a proactive approach to seeking opportunities for local small to medium enterprises throughout the duration of the project.

Nicholas Pollard, chief executive officer for Balfour Beatty Construction Services UK, said, “Originally built 40 years ago, this section of road is currently one of the more congested sections of road on the Highways Agency’s network. We are delighted to have been selected to carry out these essential improvement works which will increase road user capacity by 30%, reduce congestion and support regeneration and development, helping to boost the local economy.

“As a leading road designer, constructor, asset manager, technology and maintenance provider we have been working in partnership with the Highways Agency since 1994 and have collaborated with them and our supply chain to successfully deliver a number of their flagship projects such as the £371 million A3 Hindhead Tunnel and the £360million A46 Newark to Widmerpool Improvement Scheme.”

Balfour Beatty’s professional services division, Parsons Brinckerhoff, has provided design support for the scheme.

Works commence on site in late summer and are due for completion in early 2016.

For more information on companies in this article

Related Content

  • Bridge improvements reduce flood threat
    April 4, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
  • Balfour Beatty wins major UK road repair contracts
    February 3, 2016
    Balfour Beatty is now working on a seven year, €323.94 million (£245 million) highways maintenance contract in the UK. This package of works is for Coventry City Council, Solihull Metropolitan Borough Council and Warwickshire County Council. There is an option to extend the contract for a further three years. Balfour Beatty Living Places will work in partnership with the three Councils. This collaborative arrangement in the local authority highways market will provide a single source service provider acr
  • Balfour Beatty wins €225mn UK motorway upgrade contract
    June 23, 2014
    Balfour Beatty has won a €225 million (£184 million) motorway upgrade contract from the Highways Agency. A total of 27.3kms (17 miles) on the M60 and M72 will be upgraded. The work includes converting the carriageway between junctions 18 and 20 on the M72 to a four-lane motorway. The carriageway stretch between junctions 8 and 12 on the M60 will also be upgraded. Employing around 1,000, the work is due to begin this month (July 2014) and be completed by autumn 2017.
  • Velocity-Balfour Beatty tackling potholes
    May 13, 2014
    It is the bugbear of motorists worldwide, and costs UK councils alone an estimated US$82.12 million (£50 million) in compensation each year. Now Balfour Beatty is partnering with specialist supplier Velocity and North Somerset Council in south-west England to tackle potholes using innovative technology which vastly reduces disruption to road users. The method, called ‘Spray Injection’ patching, is allowing Balfour Beatty to repair nearly 700 potholes a week on its highways maintenance contract repairing