Skip to main content

Balfour Beatty awarded €54.01 million A1 improvement scheme

Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
June 5, 2014 Read time: 3 mins
1146 Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England.

The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.

The widening works will include the installation of reinforced earth and concrete walls and the Balfour Beatty patented King Sheet Piling System which will reduce the pile area and pile driving depth associated with traditional methods thereby reducing the overall construction  programme.  Alongside, extensive traffic management plans will allow the installation to be carried out during the day which will reduce noisy working during the night.

The existing merge and diverge arrangements will be reconfigured with the widened A1 carriageway requiring replacing and/or repositioning of fencing, road restraint systems, drainage, traffic signs, road markings, street lighting and technology structures.  Landscaping and accommodation works on the trunk road and local road networks will retain the existing cutting and embankment slopes.

The hardening of the central reserve between Coal House and Lobley Hill will maximise the availability for two lanes of traffic in each direction throughout the duration of the contract, minimising disruption for road users.

Balfour Beatty’s sustainable approach will include excavated material being utilised as part of the reinforced earth structure and verge fill, with existing road pavement planing being reused as the sub-base within the footway construction.  Other excess materials will be taken off site and recycled on construction projects across the north east of England. Additionally, the scheme will employ over 200 people at construction peak including a commitment to three apprentices and two graduates and a proactive approach to seeking opportunities for local small to medium enterprises throughout the duration of the project.

Nicholas Pollard, chief executive officer for Balfour Beatty Construction Services UK, said, “Originally built 40 years ago, this section of road is currently one of the more congested sections of road on the Highways Agency’s network. We are delighted to have been selected to carry out these essential improvement works which will increase road user capacity by 30%, reduce congestion and support regeneration and development, helping to boost the local economy.

“As a leading road designer, constructor, asset manager, technology and maintenance provider we have been working in partnership with the Highways Agency since 1994 and have collaborated with them and our supply chain to successfully deliver a number of their flagship projects such as the £371 million A3 Hindhead Tunnel and the £360million A46 Newark to Widmerpool Improvement Scheme.”

Balfour Beatty’s professional services division, Parsons Brinckerhoff, has provided design support for the scheme.

Works commence on site in late summer and are due for completion in early 2016.

For more information on companies in this article

Related Content

  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Cleveland Bridge wins UK flyover contract
    March 26, 2020
    Cleveland Bridge has won a major contract for a flyover in the UK.
  • Balfour Beatty wins road contract for Norfolk
    November 27, 2015
    Balfour Beatty has been awarded a €147.72 million (£104 million) road scheme by Norfolk County Council to complete works on the Norwich Northern Distributor Road (NNDR). The new road will serve Broadland, Norfolk, and improve access to North Norfolk and Norwich International Airport, with better links to Great Yarmouth and the south of the region. It will also bring relief on congested and unsuitable roads around the north and east of Norwich and improve capacity for future growth in jobs and housing.
  • Balfour Beatty wins Midlands road technology maintenance package
    April 23, 2014
    Balfour Beatty has secured its third Regional Technology Maintenance Contract (RTMC) from the Highways Agency. This deal is worth some €10.56 million (£8.7 million) over five years. The package involves maintaining around 28,000 technology assets on behalf of the Highways Agency and will cover both the Highways Agency’s Area 7 (the East Midlands) and Area 9 (the West Midlands). The technology service provided by Balfour Beatty includes responsibility for managing and maintaining road-side technology systems