Skip to main content

Autobahn bridge in Bavaria demolished with explosives (VIDEO)

A demolition contractor in the north of Bavaria recently used 200kg of explosives to demolish an old autobahn viaduct. Situated close to the town of Bad Kissingen and to the north of the city of Nuremberg, the 46 year old A7 viaduct had reached the end of its working life and a new structure had been built alongside in this scenic rural area. Pre-weakening work had been carried out using hydraulic breakers along with drilling the necessary blastholes, to ensure the supports and deck collapsed in a controlle
July 1, 2013 Read time: 2 mins
A demolition contractor in the north of Bavaria recently used 200kg of explosives to demolish an old autobahn viaduct. Situated close to the town of Bad Kissingen and to the north of the city of Nuremberg, the 46 year old A7 viaduct had reached the end of its working life and a new structure had been built alongside in this scenic rural area. Pre-weakening work had been carried out using hydraulic breakers along with drilling the necessary blastholes, to ensure the supports and deck collapsed in a controlled fashion. Traffic on the new viaduct was halted briefly by the police for the duration of the blast, which was carried out safely and successfully by the contractor. An enterprising local farmer had clearly allowed spectators to congregate in a field on the nearby hillside to watch the demolition, while coffee and beer were being sold to those with a thirst.

Related Content

  • Atlas Copco for Brazil bridge demolition
    July 2, 2013
    Brazilian demolition specialist Comprex was chosen to demolish a bridge connecting districts in the city of Vitória in the state of Espirito Santo. For environmental reasons, debris was not permitted to fall into the waterway under the bridge, and special arrangements had to be made for the removal of the demolition waste. Comprex chose Atlas Copco hydraulic breakers and CombiCutters for the jobsite where three new bridges have been built over the old bridge, which was no longer able to support the increasi
  • VIDEO: Bridge demolition jobs in CA
    November 23, 2015
    Explosive demolition techniques were used to remove a bridge structure in the US at the weekend. In California on the west coast, the removal of a pier from the old Bay Bridge structure was carried out. The explosive demolition was organised by 5246 Caltrans, with around 10tonnes of explosives being used to blast the redundant bridge pier. Protective layers of wood and steel were used to prevent debris from the massive 24.4m x 42.7m bridge pier from being thrown into the air.
  • Innovative formwork solution to bridge construction
    February 20, 2012
    Innovative solutions are being applied to the construction of bridge structures as Patrick Smith reports. RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for construction of the much-needed Monteporreiro Viaduct in northern Spain. The viaduct will connect Monteporreiro with the Benedictine Monastery of San Bieito Lérez on the other side of the river, and in the process will ease congestion in the nearby town of Pontevedra, diverting some 5,000 vehicles/day.
  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.