Skip to main content

Autobahn bridge in Bavaria demolished with explosives (VIDEO)

A demolition contractor in the north of Bavaria recently used 200kg of explosives to demolish an old autobahn viaduct. Situated close to the town of Bad Kissingen and to the north of the city of Nuremberg, the 46 year old A7 viaduct had reached the end of its working life and a new structure had been built alongside in this scenic rural area. Pre-weakening work had been carried out using hydraulic breakers along with drilling the necessary blastholes, to ensure the supports and deck collapsed in a controlle
July 1, 2013 Read time: 2 mins
A demolition contractor in the north of Bavaria recently used 200kg of explosives to demolish an old autobahn viaduct. Situated close to the town of Bad Kissingen and to the north of the city of Nuremberg, the 46 year old A7 viaduct had reached the end of its working life and a new structure had been built alongside in this scenic rural area. Pre-weakening work had been carried out using hydraulic breakers along with drilling the necessary blastholes, to ensure the supports and deck collapsed in a controlled fashion. Traffic on the new viaduct was halted briefly by the police for the duration of the blast, which was carried out safely and successfully by the contractor. An enterprising local farmer had clearly allowed spectators to congregate in a field on the nearby hillside to watch the demolition, while coffee and beer were being sold to those with a thirst.

Related Content

  • Kuwait’s Sheikh Jaber al-Ahmad Al-Sabah Causeway opens
    August 27, 2019
    World Highways revisits the world’s fourth longest sea bridge - four years to construct and which has slashed travel time between Kuwait’s largest island and the capital city
  • 'Quiet' work in Stockholm
    July 24, 2012
    Aquajet's new Ecosilence Power Pack has been tested to its limits on the tunnel/bridge renovation work in the city's historic Old Town and has exceeded all expectations, according to E-Schakt's project supervisor, Andreas Nordstrom. Equipment from the Swedish company, including Ecosilence making its debut, is being used in the tunnel and on the 1.2km Central Bridge (or 'Three Bridges'), which was built in the 1950s and which links the northern district of Norrmalm and the southern district of Södermalm. It
  • Recycled aggregates report released
    January 24, 2019
    A new report highlights the importance of recycled aggregates for the global construction market. The report has been compiled by research specialist Fact.Mr and shows that prospects remain bullish for the recycled construction aggregates market. According to the report, there were sales of recycled aggregates in excess of over 3.7 million tonnes estimated in 2018, with a 5% growth expected for 2019. The report highlights that the recycled construction aggregates market is influenced by various factors, ra
  • Colombia bridges for redesign and repairs
    October 12, 2020
    Two key Colombian bridges are to be redesigned and repaired.