Skip to main content

Austria bridge crossing for Danube

A new bridge is being built in Austria to span the Danube River. The project is expected to cost €60 million. The new link will be constructed in the city of Linz. Construction of the new Donaubrücke (Danube Bridge) will commence in late 2017. The link is expected to open to traffic in the third quarter of 2020. The state of Upper Austria will provided 40% of the financing required.
December 13, 2016 Read time: 1 min
A new bridge is being built in Austria to span the Danube River. The project is expected to cost €60 million. The new link will be constructed in the city of Linz. Construction of the new Donaubrücke (Danube Bridge) will commence in late 2017. The link is expected to open to traffic in the third quarter of 2020. The state of Upper Austria will provided 40% of the financing required.

Related Content

  • New bridge to connect Sri Lanka capital
    September 2, 2015
    Sri Lanka plans to construct a new bridge that will improve transport connections to capital Colombo. The six lane bridge will span the Kelani River. It will be built parallel to the existing Kelani Bridge (Japan Friendship Bridge) and help cut congestion on this important travel route. The project is expected to cost US$335.6 million. The bridge will feature an elevated approach road and the project also includes the construction of interchanges linking the Colombo-Katunayake Expressway (CKE), Baseline Roa
  • New bridge proposed for Mobile Bay, Alabama
    May 19, 2022
    A new bridge link is proposed for Mobile Bay, Alabama.
  • Romanian bridge works now underway
    March 16, 2020
    Work is now underway on a key Romanian bridge project.
  • Vietnam bridge, road and highway development projects
    June 20, 2018
    Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha