Skip to main content

Australia's longest bridge

Plans are now moving forward for the construction of a 3.2km bridge in Australia's New South Wales.
February 10, 2012 Read time: 1 min
Construction work is progressing according to plan on the Pacific Highway upgrade
Plans are now moving forward for the construction of a 3.2km bridge in Australia's New South Wales. The structure will cost some US$625.4 million (A$618 million) to complete and will be Australia's longest bridge once it is open to traffic. Australian firm 1362 Abigroup will carry out the work, which involves extending an existing 2.2km link by 1km. The bridge will form part of the 14.5km Kempsey Bypass project and the link is expected to be open to traffic during 2013.

For more information on companies in this article

Related Content

  • Resolution for delayed Texas bridge project
    October 23, 2023
    A resolution has been reached for a massive Texas bridge project.
  • Romania eyes new Danube River bridge
    August 20, 2024
    The announcement by Romania’s minister for transport, Sorin Grindeanu, comes as the Friendship Bridge, connecting Giurgiu in Romania and Ruse in Bulgaria, is closed for repairs.
  • Construction work will start shortly on major Indonesian tollroad
    July 22, 2013
    In Indonesia the country’s government intends to speed up preparations for the massive Trans Sumatra tollroad project. This 2,700km highway link is costing close to US$30 billion and much of the work will be carried out by the state-owned contractor, Hutama Kaya. Construction will commence in late-September 2013 and the project is scheduled to be fully open by 2025. This highway will connect all 10 provinces in Sumatra Island through Aceh-Lampung. Phase one of the project is for the construction of four sec
  • Redevelopments at southern Polish airports
    August 21, 2013
    Rzeszów-Jasionka Airport in the south-east of Poland is now benefiting from a new taxiway constructed over a 50-month period and costing some €22.5 million. The work was required as the airport needs to increase capacity to cope with growing passenger traffic. The main portion of the project was for the construction of a 3km long taxiway, which lies parallel to the airport’s main runway. This taxiway now allows aircraft to manoeuvre away from the single runway and free up capacity for take-offs and land