Skip to main content

Australian road project in Queensland delayed

Work on a major road project in the Australian state of Queensland is being delayed due to safety concerns. The contractor, Cintra, has been ordered by the local authorities in the state to stop work on two piers that will support the viaduct stretch of the US$1.21 billion Toowoomba Second Range Crossing project. This follows two recent incidents, which are now being investigated by Workplace Health and Safety Queensland. The project is for a 41km bypass to the north of Toowoomba connecting the Gore Highway
May 9, 2018 Read time: 1 min

Work on a major road project in the Australian state of Queensland is being delayed due to safety concerns. The contractor, 930 Cintra, has been ordered by the local authorities in the state to stop work on two piers that will support the viaduct stretch of the US$1.21 billion Toowoomba Second Range Crossing project. This follows two recent incidents, which are now being investigated by Workplace Health and Safety Queensland. The project is for a 41km bypass to the north of Toowoomba connecting the Gore Highway with the Warrego Highway.

For more information on companies in this article

Related Content

  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • Ecuador road widening project planned
    July 3, 2018
    A road widening project worth US$134.3 million is now going ahead in Ecuador. The road connecting Aloag with Santo Domingo is being improved along a 100km stretch, widening the route so that it will feature two lanes in either direction instead of the single lane in either direction at present. This will boost the transport connection between Pichincha Province and Santo Domingo de los Tsachilas Province. The contract was originally awarded in 2015 but stalled in 2017 following a disagreement over tolling.
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports