Skip to main content

Australian overpass demolition video highlights effective use of strap on camera

This video clip from Australia shows how up close how an aged overpass can be removed quickly and efficiently, while minimising the disturbance to surrounding traffic or neighbouring properties.
April 7, 2014 Read time: 1 min
This video clip from Australia shows how up close how an aged overpass can be removed quickly and efficiently, while minimising the disturbance to surrounding traffic or neighbouring properties. Effective use of suitable equipment being used by experienced operators makes for a speedy removal of structures deemed no longer able to cope with increasing traffic flow requirements.

Related Content

  • Explosive demolition for Kansas City bridge
    June 9, 2014
    Explosive demolition was used to remove an aged bridge in Kansas City on Saturday 7th June.
  • Herrenkencht has developed a novel pipeline installation package
    January 6, 2017
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • Herrenkencht has developed a novel pipeline installation package
    February 6, 2013
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • VIDEO of specialist contractor’s successful bridge demolition in Canada
    May 12, 2015
    Specialist contractor Priestly Demolition recently carried out a successful project in Ontario, Canada. The firm used its specialist skills to remove The Fountain Road Overpass, crossing Highway 401. A fleet of excavators equipped with demolition tools, including breakers and cutting equipment, was brought into to carry out the work using an overnight closure of the highway. Other machines including wheeled loaders and backhoe loaders were used to remove the broken out materials and to carry out other general duties.