Skip to main content

Australia tunnel project faces dispute

A major tunnel project in Australia is facing a serious delay due to slow progress between the construction firms and construction unions. The US$4.73 billion (A$6.7 billion) project for the West Gate Tunnel will provide an imporoved link between the West Gate Freeway and the CityLink, reducing congestion and cutting journey times for drivers.
November 14, 2018 Read time: 1 min

A major tunnel project in Australia is facing a serious delay due to slow progress between the construction firms and construction unions. The US$4.73 billion (A$6.7 billion) project for the West Gate Tunnel will provide an imporoved link between the West Gate Freeway and the CityLink, reducing congestion and cutting journey times for drivers. However the construction firms and construction unions have been in dispute over the issue of working conditions and rest days. How great a delay this will result in for the project is not clear.

Related Content

  • Southern Germany tunnel project mooted
    March 23, 2017
    Plans have been drawn up for a new road tunnel in the German town of Oberau, located to the south of Munich in Bavaria.
  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • Major road tunnel contract awarded, for Mumbai, India
    October 6, 2023
    A key road tunnel contract has been awarded, for Mumbai, India.
  • Excavation offering
    July 16, 2012
    There are various ways of building a tunnel, and for excavation jobs many contractors prefer to use versions of standard machines that have instead been converted to suit the confines of tunnelling applications. Some contractors opt to adapt their own units and with ventilation being an issue in underground work, engine emissions are a key focus when adapting machines. Exhaust filters and other after treatment solutions are usually required and there are an array of off-the-shelf packages available as well