Skip to main content

Australia tunnel project faces dispute

A major tunnel project in Australia is facing a serious delay due to slow progress between the construction firms and construction unions. The US$4.73 billion (A$6.7 billion) project for the West Gate Tunnel will provide an imporoved link between the West Gate Freeway and the CityLink, reducing congestion and cutting journey times for drivers.
November 14, 2018 Read time: 1 min

A major tunnel project in Australia is facing a serious delay due to slow progress between the construction firms and construction unions. The US$4.73 billion (A$6.7 billion) project for the West Gate Tunnel will provide an imporoved link between the West Gate Freeway and the CityLink, reducing congestion and cutting journey times for drivers. However the construction firms and construction unions have been in dispute over the issue of working conditions and rest days. How great a delay this will result in for the project is not clear.

Related Content

  • Australia tunnel compensation package required?
    January 10, 2019
    The fallback option for a major road and tunnel project in Australia now includes the possible payment of compensation should construction delays hold back its opening. The potential compensation package is being planned by the Victoria State Government to Transurban for Melbourne’s massive US$4.73 billion (A$6.7 billion) West Gate Tunnel project. The size of the compensation fee remains as yet unannounced, although some estimates suggest it could be as high as $1.27 billion (A$1.8 billion). Transurban expe
  • Australian project, costs spiral
    October 5, 2020
    Costs are spiralling for a major Australian project.
  • West Gate Tunnel delays
    May 13, 2020
    Australia’s West Gate Tunnel project will be delayed
  • Australia highway opening soon in Melbourne
    October 19, 2017
    Melbourne’s major tolled highway project is due to open to traffic shortly, some three months earlier than originally anticipated. The CityLink project has been a major one for Victoria State and has added new lanes for the route along a length of 30km. Carrying around 210,000 vehicles/day, the CityLink route handles the highest levels of any traffic route in Melbourne. The addition of the new lanes on the route has formed part of the major Tulla Widening Project by VicRoads to improve road connections in V