Skip to main content

Australia highway opening soon in Melbourne

Melbourne’s major tolled highway project is due to open to traffic shortly, some three months earlier than originally anticipated. The CityLink project has been a major one for Victoria State and has added new lanes for the route along a length of 30km. Carrying around 210,000 vehicles/day, the CityLink route handles the highest levels of any traffic route in Melbourne. The addition of the new lanes on the route has formed part of the major Tulla Widening Project by VicRoads to improve road connections in V
October 19, 2017 Read time: 1 min

Melbourne’s major tolled highway project is due to open to traffic shortly, some three months earlier than originally anticipated. The CityLink project has been a major one for Victoria State and has added new lanes for the route along a length of 30km. Carrying around 210,000 vehicles/day, the CityLink route handles the highest levels of any traffic route in Melbourne. The addition of the new lanes on the route has formed part of the major Tulla Widening Project by 5155 VicRoads to improve road connections in Victoria State. This has cost some US$1.02 billion (A$1.28 billion). The new lanes run from the West Gate Freeway to Bulla Road and will help cut congestion and improve traffic flow, lowering journey times for drivers.

For more information on companies in this article

Related Content

  • UK average speed camera installation proving successful
    January 27, 2015
    Data from the A9 route in Scotland shows that the installation of average speed camera technology is helping cut crashes. This is Europe’s longest single enforcement scheme, with the technology having been installed along a 220km stretch of the A9 in Scotland. Figures from the route show that the average speed enforcement scheme, which uses SPECS technology supplied by Vysionics, is helping cut casualties while improving journey reliability and driver behaviour.
  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • Melbourne’s new $20.4 billion ring road
    July 17, 2025
    Work for Melbourne’s new $20.4 billion ring road will have to be ahead of schedule.
  • Cutting congestion in California with highway works
    December 15, 2023
    New California highway projects will help reduce congestion.