Skip to main content

Astaldi begins drilling tunnels on Poland’s S7 dual carriageway

Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
March 14, 2017 Read time: 2 mins
Italian contractor 1324 Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland.

Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long.

Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016

Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions.

The north-south S7, when completed, will run 720km from Gdańsk on the Baltic coast through Elbląg, Warsaw, Radom, Kielce and Kraków to Rabka near Poland’s southern border with Slovakia. The vast majority of construction will be upgrading National Road 7 (DK 7).

The S7 is part of European route E77, in turn part of the inter-European road system, starting in north-eastern Russia and running 1,690km through the Baltic Sea states, into Poland and connecting with central Europe.

Astaldi’s highways division has been particularly active in Turkey – the Mount Bolu Tunnel, the Izmit Bay Bridge and, in Istanbul, the Third Bosphorus Bridge.

In 2015, Italian firm Salini Impregilo started construction of a 21.5km stretch of the S7 between the Jedrzejow and Checiny junctions under a deal worth nearly €144.67 million. Completion is set for the third quarter of of this year. Meanwhile, a consortium headed by Budimex won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 between Ostroda Polnoc and Ostroda Poludnie.

In 2014, a Strabag consortium, picked up a €127.93 million contract for a 4.5km section of the S7 dual carriageway near Krakow, including construction of a bridge over the Vistula River.

For more information on companies in this article

Related Content

  • Strabag secures US$2.23billion Italian motorway build project
    March 14, 2012
    The US$2.23billion (€1.7billion) contract to build the Pedemontana Lombarda motorway in northern Italy has been won by the Strabag consortium.
  • New UK dual carriageway project commencing
    February 14, 2020
    Work for an important dual carriageway connection in the UK is now moving ahead.
  • Lane, part of Salini Impregilo Group, wins I-440/US 1 deal in North Carolina
    October 26, 2018
    Lane Construction, the US subsidiary of Italy’s Salini Impregilo Group, has won a US$346 million design-build contract for the Interstate I-440/US 1 in North Carolina. Lane will be making improvements to the Interstate I-440/US 1 Wake County from south of Walnut Street to north of Wade Avenue. Around 10.5km of the highway - referred to locally as the Raleigh Beltline - will be widened from four lanes to six lanes. The work involves replacing pavement and bridges and upgrading interchanges and is expected
  • STRABAG working on Slovakian highway
    December 16, 2013
    A consortium is now working on the construction of one stretch of Slovakia’s D1 highway. The section lies between Hričovské Podhradie and Lietavská Lúčka and the project is worth €427 million. The consortium comprises four companies; with Doprastav, Váhostav and STRABAG all holding equal 32% stakes of the contract and Metrostav having a minority 4% share. The work being carried out by Doprastav, Váhostav and STRABAG is equivalent to some €140 million each. The construction work is expected to take 48 months