Skip to main content

Astaldi begins drilling tunnels on Poland’s S7 dual carriageway

Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
March 14, 2017 Read time: 2 mins
Italian contractor 1324 Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland.

Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long.

Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016

Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions.

The north-south S7, when completed, will run 720km from Gdańsk on the Baltic coast through Elbląg, Warsaw, Radom, Kielce and Kraków to Rabka near Poland’s southern border with Slovakia. The vast majority of construction will be upgrading National Road 7 (DK 7).

The S7 is part of European route E77, in turn part of the inter-European road system, starting in north-eastern Russia and running 1,690km through the Baltic Sea states, into Poland and connecting with central Europe.

Astaldi’s highways division has been particularly active in Turkey – the Mount Bolu Tunnel, the Izmit Bay Bridge and, in Istanbul, the Third Bosphorus Bridge.

In 2015, Italian firm Salini Impregilo started construction of a 21.5km stretch of the S7 between the Jedrzejow and Checiny junctions under a deal worth nearly €144.67 million. Completion is set for the third quarter of of this year. Meanwhile, a consortium headed by Budimex won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 between Ostroda Polnoc and Ostroda Poludnie.

In 2014, a Strabag consortium, picked up a €127.93 million contract for a 4.5km section of the S7 dual carriageway near Krakow, including construction of a bridge over the Vistula River.

For more information on companies in this article

Related Content

  • Poland: GDDKiA sets winter road maintenance budget
    October 22, 2014
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) is planning to spend US$151.37 million (€118.3 million) on winter-specific road maintenance for 2014/15. Around 2,300 snowploughs and 1,300 salt trucks will be readied for winter work. GDDKiA also plans to install more than 1,400km snow-protection screens along roads. Meanwhile, the country is moving ahead with several key highway projects, one involving construction of three sections of the new southern ring road around the Polish c
  • Vahostav-SK and TuCon to build Slovakia’s Presov northern bypass
    July 4, 2019
    Slovak contractors Vahostav-SK and TuCon will build the first stage of the 4.3km northern bypass in Presov on the R4 dual carriageway. The contract was awarded in an open tender by Slovakia’s motorway company NDS. The consortium offered the lowest price of just under €143 million against around €170 million as estimated by NDS which says work will start this summer. NDS also said that it had received five firm bids for the work which will likely take three years and nine months, for completion in 2
  • Key Polish road contract awarded
    April 16, 2021
    A key Polish road contract has been awarded to Poland.
  • STRABAG wins new Romanian dual carriageway deal
    July 27, 2021
    STRABAG has been awarded a major new Romanian dual carriageway deal.