Skip to main content

Astaldi begins drilling tunnels on Poland’s S7 dual carriageway

Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
March 14, 2017 Read time: 2 mins
Italian contractor 1324 Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland.

Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long.

Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016

Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions.

The north-south S7, when completed, will run 720km from Gdańsk on the Baltic coast through Elbląg, Warsaw, Radom, Kielce and Kraków to Rabka near Poland’s southern border with Slovakia. The vast majority of construction will be upgrading National Road 7 (DK 7).

The S7 is part of European route E77, in turn part of the inter-European road system, starting in north-eastern Russia and running 1,690km through the Baltic Sea states, into Poland and connecting with central Europe.

Astaldi’s highways division has been particularly active in Turkey – the Mount Bolu Tunnel, the Izmit Bay Bridge and, in Istanbul, the Third Bosphorus Bridge.

In 2015, Italian firm Salini Impregilo started construction of a 21.5km stretch of the S7 between the Jedrzejow and Checiny junctions under a deal worth nearly €144.67 million. Completion is set for the third quarter of of this year. Meanwhile, a consortium headed by Budimex won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 between Ostroda Polnoc and Ostroda Poludnie.

In 2014, a Strabag consortium, picked up a €127.93 million contract for a 4.5km section of the S7 dual carriageway near Krakow, including construction of a bridge over the Vistula River.

For more information on companies in this article

Related Content

  • Consortium signs contract for section of S5 expressway in Poland
    August 8, 2014
    A consortium consisting of Heilit+Woerner (a subsidiary of Austrian company Strabag) and Budimex, has signed the contract to build a section of the S5 expressway between Poznań and Wrocław, Poland, with a gross value of about €138 million.
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
  • Poland: A1 tender attracts 11 offers, including one from Strabag
    February 19, 2015
    Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids. A Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million. A consortium formed by Polaqua and Dragados was the second lowest, at €156.4 million. The highest bid was €183.4 million. The contract calls for a construction period of 30 months. Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion
  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.