Skip to main content

April date for Panama Canal bridge tender award?

The Panama Canal Authority (ACP) has tendered a consultancy to complete designs for a new long-span cable-stayed bridge on the Atlantic side of the Panama Canal.
March 5, 2012 Read time: 1 min
The 1562 Panama Canal Authority (ACP) has tendered a consultancy to complete designs for a new long-span cable-stayed bridge on the Atlantic side of the Panama Canal.

The consultant will deliver final designs, construction specification and estimated construction cost, which is not to exceed US$350 million, it is reported. .

A site visit is scheduled for 2 March, 2011, and bids are due 30 March.

ACP will reportedly award the tender at the end of April, and aims to tender construction of the bridge in February 2012.

The structure must have a vertical clearance of 75m above the canal, taking into account the possibility of a fourth set of locks, with a lifespan of 100 years.

The project also includes designing access roads on either side of the canal, as well as other bridges that may be required as part of those roads.

The contractor will have 270 working days from the award notice to complete the designs.

Bidders must have designed at least three comparable projects within the last 25 years. At least one of those designed must be within the last ten years and must be built or at least 50% complete at the time of submitting the proposal.

For more information on companies in this article

Related Content

  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.
  • Tanzania’s work on East Africa’s multi-national road project
    November 28, 2022
    Tanzania is kick-starting construction work on the missing link in East Africa's multinational road
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.