Skip to main content

Approval for new Gotthard Tunnel

Approval has been given for the project to build a new parallel link for the Gotthard Tunnel in Switzerland. The second road tunnel has been given the go ahead after 57% of Swiss subjects who voted in a referendum backed the plans. Construction of the new tunnel will start in 2020 and will end in 2027. In addition, the project calls for the current Gotthard road tunnel to be closed for three years for renovation work so as to bring it up to the latest safety requirements. Both tunnels will be open from 2030
March 4, 2016 Read time: 2 mins
Approval has been given for the project to build a new parallel link for the Gotthard Tunnel in Switzerland. The second road tunnel has been given the go ahead after 57% of Swiss subjects who voted in a referendum backed the plans. Construction of the new tunnel will start in 2020 and will end in 2027. In addition, the project calls for the current Gotthard road tunnel to be closed for three years for renovation work so as to bring it up to the latest safety requirements. Both tunnels will be open from 2030, and each will carry traffic in one direction only. Both tunnels will have two lanes, although there will only be one lane in operation, so that the volume of traffic using the tunnels does not increase. The Gotthard tunnel forms a key stretch of the most important transit corridor through Switzerland.

Related Content

  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • Ambitious road tunnelling projects around the world
    November 29, 2013
    The construction of the world’s longest subsea road tunnel in Norway and a vital new link under the Bosphorus Strait in Turkey are among a host of exciting, major road tunnel-based projects currently being undertaken across the globe. Guy Woodford reports Sandvik DTi series tunnelling jumbos are being used for the excavation of Solbakktunnel, set to become the world’s longest subsea road tunnel.
  • Norwegians would build new bridge and tunnel links
    June 18, 2021
    Norway’s road transport network is changing radically as the country gears up for greater EV use as well as a gradual phasing out of its traditional ferry links
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).