Skip to main content

Approval for new Gotthard Tunnel

Approval has been given for the project to build a new parallel link for the Gotthard Tunnel in Switzerland. The second road tunnel has been given the go ahead after 57% of Swiss subjects who voted in a referendum backed the plans. Construction of the new tunnel will start in 2020 and will end in 2027. In addition, the project calls for the current Gotthard road tunnel to be closed for three years for renovation work so as to bring it up to the latest safety requirements. Both tunnels will be open from 2030
March 4, 2016 Read time: 2 mins
Approval has been given for the project to build a new parallel link for the Gotthard Tunnel in Switzerland. The second road tunnel has been given the go ahead after 57% of Swiss subjects who voted in a referendum backed the plans. Construction of the new tunnel will start in 2020 and will end in 2027. In addition, the project calls for the current Gotthard road tunnel to be closed for three years for renovation work so as to bring it up to the latest safety requirements. Both tunnels will be open from 2030, and each will carry traffic in one direction only. Both tunnels will have two lanes, although there will only be one lane in operation, so that the volume of traffic using the tunnels does not increase. The Gotthard tunnel forms a key stretch of the most important transit corridor through Switzerland.

Related Content

  • Swiss tunnel options
    June 19, 2012
    Discussions are underway in Switzerland at present over options for maintaining and upgrading the Gotthard Road Tunnel in the 2020-2025 period. One option is likely to cost some €539.65 million (CHF 650 million), requiring the tunnel to be closed for a 30 month period. The other option is likely to cost €752 million and will see the work carried out in stages over a 42 month stretch. For this second option, the tunnel would remain open during the summer period so as to allow it to carry the higher volumes o
  • Swiss tunnel decision due
    April 24, 2012
    Discussions are underway in Switzerland at present over options for maintaining and upgrading the Gotthard Road Tunnel in the 2020-2025 period. One option is likely to cost some €539.65 million (CHF 650 million), requiring the tunnel to be closed for a 30 month period. The other, is likely to cost €752 million and will see the work carried out the necessary work in stages over a 42 month stretch. For this second option, the tunnel would remain open during the summer period so as to allow it to carry the hig
  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.
  • Austria's new tunnel meets safety regulations
    July 13, 2012
    New safety regulations and high traffic volumes require new tunnel construction all across Europe. Mike Woof reports Anew highway tunnel now being built in Austria will boost traffic volumes and safety standards on a key European route. The existing Pfänder Tunnel lies close to Austria's borders with Germany and Switzerland and carries a heavy traffic volume, so a new parallel tunnel is under construction to help spread this load, increasing capacity as well as safety. Stringent tunnel safety standards have