Skip to main content

AmeySRM awarded UK's A533 bridge work

Under the €23 million contract work will start early 2021 for completion in summer 2022.
By David Arminas July 14, 2020 Read time: 2 mins
The two-span replacement will be adjacent to an existing bridge over the M56

Highways England and Amey Sir Robert McAlpine (AmeySRM) have signed a contract for construction of a new A533 Expressway Bridge replacement in the UK.

Under the €23 million contract work will start in spring 2021 for completion in summer 2022.

The existing 70m span bridge carries the A533 Expressway over the M56 motorway in the northwest of England. But it has reached the end of its life, according to AmeySRM, a cooperation between contractors Amey and Sir Robert McAlpine.

The  two-span replacement will be constructed adjacent to the existing bridge and have much improved cycling and pedestrian facilities, noted Robert Allen, framework partnership director for AmeySRM. “This scheme is one of a number of comprehensive upgrades our collaborative approach as AmeySRM is delivering across the northwest, creating better journeys for those using the network,” said Allen.

To ensure that the works cause minimal disruption, the main concrete bridge deck will be assembled off site in a nearby compound then transported and lowered into its final position using a self-propelled modular transporter. Once the new bridge is open to traffic, the existing structure will be demolished and the area fully reinstated.

AmeySRM is already involved in a €47.3 million overhaul of junction 19 of the M6 motorway near Rugby in central England. Work includes construction of a new bridge through the existing roundabout and over the M6, creating a better flow between the motorway and the A556 highway. AmeySRM was awarded the scheme by Highways England and is one of 13 companies – known as Delivery Integration Partners – which are now working on 18 projects.

Amey is part of the services division of Spanish global infrastructure group Ferrovial.

For more information on companies in this article

Related Content

  • Auckland’s future strategic transport requirements
    July 5, 2012
    The Auckland Harbour Bridge is at the stage that it cannot cope with much more traffic, yet the population of the Auckland region continues to grow at a steady rate. Coupled with that, the bridge is a key link in the most important transport corridor in the country, State Highway One. Without it, the country would struggle to function. Not only home to New Zealand's largest city and one third of its population, Auckland's port is one of the country's largest. Some 140m north of the city is Marsden Point, th
  • Bridge demolition easier with modern machines
    February 23, 2012
    The speedy and safe removal of old or unwanted structures is made easier with modern, sophisticated equipment, Patrick Smith reports. The power and versatility of modern demolition tools and machines was demonstrated when a bridge was removed overnight as part of a motorway widening project.
  • The side effect – paving with a road widener
    December 13, 2018
    Sidewinder UK has been using its novel road widener machines on a series of paving jobs, including smart motorway projects. Sidewinder UK has carried out work on the M6 smart motorway contract between junction 16 and junction 19. The company used one of its road wideners to place and grade the final layer of sub-base to the balanced central reservation in readiness for Tarmac Contracting to pave the base and binder courses. An estimated 5,000tonnes of sub-base was used in the initial 6.4km x 4.7m wide st
  • Stafford access route phase opens
    January 18, 2021
    Work to build the 1.2km Stafford Western Access Route in England began in summer 2019.