Skip to main content

Amey wins €235mn Area 8 UK Highways Agency contract

Amey has been awarded the €235 million (£200 million) Area 8 contract by the Highways Agency. The contract involves the upgrade and maintenance of major A roads and motorways in parts of Bedfordshire, Cambridgeshire and Hertfordshire. Starting on 1 April 2014, The Asset Support Contract (ASC) is the 5th to be awarded by the agency to date. ASCs have been designed to help the Agency cut road maintenance costs by a quarter by 2015.
October 15, 2013 Read time: 1 min
2958 Amey has been awarded the €235 million (£200 million) Area 8 contract by the 2309 Highways Agency. The contract involves the upgrade and maintenance of major A roads and motorways in parts of Bedfordshire, Cambridgeshire and Hertfordshire. Starting on 1 April 2014, The Asset Support Contract (ASC) is the 5th to be awarded by the agency to date. ASCs have been designed to help the Agency cut road maintenance costs by a quarter by 2015.

For more information on companies in this article

Related Content

  • Upgrade work starts on junction of London’s orbital motorway M25
    February 20, 2015
    Work has started on a €136 million road improvement project on the UK’s London ring road, the M25 motorway. Crews from Balfour Beatty and Skanska have moved onto the interchange between the A13 national road and the M25 at junction 30 near Thurrock in the county Essex. The A13 on approach to the junction will be widened to four lanes in each direction and the junction itself will have dedicated link roads between the M25 and the A13. “Traffic at the junction is expected to grow by up to a quarter b
  • The Highways Agency aims to address workzone crashes
    April 10, 2013
    The UK’s Highways Agency is telling drivers to take extra care and to stick speed limits at roadworks, to prevent deaths and injuries among both road users and road workers. Eight road workers have been killed in the last three years while improving and maintaining the strategic road network in England. In addition there are many near misses, with members of the public driving through coned off areas or colliding with works vehicles. The UK Government is investing additional funding in road improvements acr
  • Kosovan highway ahead of schedule
    April 25, 2012
    In Kosovo, work is pushing ahead of schedule on the Route 7 highway to link capital Pristina with the Albanian border. Sections of the 120km highway have been opened, one year ahead of schedule. An official opening of several sections of the highway has been carried out by Kosovan leaders, including Prime Minister Hashim Thaçi, President Atifete Jahjaga, and members of Parliament, along with Albanian Prime Minister Sali Berisha and US representatives Eliot Engel (D- NY) and Gary Peters (D-MI) joined thousan
  • Colas drives measures to improve safety in Area 7 workzones
    December 11, 2015
    A pilot scheme in the United Kingdom by Colas and Solar and Electric Gates (S&EG) is using a new automatic gate to help protect operatives in Area 7 work zones. The Readi-Guard has been developed for the joint venture A-one+, led by infrastructure contractor Costain. Colas and S&EG joined forces to engineer the gate system, which opens horizontally to allow authorised vehicles into work areas. It safeguards workers because manual gate operation is not required. “The TM Access Gate is a well thought