Skip to main content

Algeria tunnel project nearly complete

Work on a major tunnel project in Algeria is due for completion shortly. The tunnel will commence carrying traffic during July 2016, although an official inauguration date has not so far been announced. The T4 tunnel will connect Constantine with Skikda and Annaba, which lie to the north and on Algeria’s coast. The 2.5km tunnel forms a section of the East-West highway. To cope with the tricky geological conditions in the area, both umbrella arch and composite roof bolting methods have been used to sup
June 9, 2016 Read time: 1 min
Work on a major tunnel project in Algeria is due for completion shortly. The tunnel will commence carrying traffic during July 2016, although an official inauguration date has not so far been announced.

The T4 tunnel will connect Constantine with Skikda and Annaba, which lie to the north and on Algeria’s coast. The 2.5km tunnel forms a section of the East-West highway.

To cope with the tricky geological conditions in the area, both umbrella arch and composite roof bolting methods have been used to support the tunnel profile during the excavation work.

Related Content

  • Mexico’s new highway for Oaxaca
    May 3, 2023
    Mexico’s Oaxaca State is to benefit from a major new highway link – Mauro Nogarin and Mike Woof report
  • Norway’s record breaking undersea road tunnel
    February 25, 2015
    The world's deepest road tunnel is currently in construction near Stavanger in Norway but is only the prelude to even larger projects - report and photographs by Adrian Greeman. Norway's convoluted coastline of fjords and high mountains is famously scenic but also a major problem for transport and connections. The country has long experience of constructing tunnels as a result. Now a series of tunnels underway, or in design, around the oil industry city of Stavanger will stretch its skills more than usual.
  • Additional highway work is planned for Algeria
    March 26, 2013
    Construction work on Algeria’s planned Hauts-plateaux highway is set to commence at the end of June 2013. The highway will run 1,300km and connect Tébessa with Naâma, with the project being split into three sections. The East stretch will be 220km long while the West section will be 305km long and in the middle will be the 495km Central section. The new highway is expected to provide an important trade route and help improve transport between Algeria and its neighbours and this forms part of Algeria’s 2030
  • Trans-Sahara highway upgrade project complete
    May 8, 2018
    Work has now been completed on Algeria’s upgrade of its 1,600km of the Trans-Sahara highway route.