Skip to main content

Algeria East-West Highway opening due

The long running saga of Algeria’s East-West Highway should come to a key point soon, when most of the route will finally be open to traffic. The 1,216km-long route will be fully operational at the end of October 2015. This is of course with the exception of the Lakhdaria section, which still requires rehabilitation work to be carried out. The repairs are expected to carry on until May or June 2016. Contractors from all over the world have been involved in the East-West highway project but certain stretches
September 9, 2015 Read time: 2 mins
The long running saga of Algeria’s East-West Highway should come to a key point soon, when most of the route will finally be open to traffic. The 1,216km-long route will be fully operational at the end of October 2015. This is of course with the exception of the Lakhdaria section, which still requires rehabilitation work to be carried out. The repairs are expected to carry on until May or June 2016. Contractors from all over the world have been involved in the East-West highway project but certain stretches built by Chinese, South Korean and Japanese firms have suffered delays as well as quality issues. These have been the subject of official scrutiny and not all the legal cases have yet been resolved. As part of the commissioning, the national agency of motorways ANA and the motorway management agency AGA will merge into the Algerian motorway agency ADA, the Ministry of Public Works has revealed.

Related Content

  • New highway projects planned for Algeria
    September 16, 2013
    Plans are moving ahead in Algeria for key highway projects. Algeria’s public works ministry has revealed that preparatory work for the Transrhumel viaduct in Constantine will be completed by the end of 2013. The Transrhumel viaduct is being constructed by the Andrade-Gutierrez consortium to a Brazilian design.
  • Algerian highway dispute
    February 17, 2012
    Legal and technical complications are the cause of a dispute in between the Algerian transport authorities and four Japanese contractors over a US$6.56 billion highway project.
  • Additional highway work is planned for Algeria
    March 26, 2013
    Construction work on Algeria’s planned Hauts-plateaux highway is set to commence at the end of June 2013. The highway will run 1,300km and connect Tébessa with Naâma, with the project being split into three sections. The East stretch will be 220km long while the West section will be 305km long and in the middle will be the 495km Central section. The new highway is expected to provide an important trade route and help improve transport between Algeria and its neighbours and this forms part of Algeria’s 2030
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports