Skip to main content

Algeria East-West Highway opening due

The long running saga of Algeria’s East-West Highway should come to a key point soon, when most of the route will finally be open to traffic. The 1,216km-long route will be fully operational at the end of October 2015. This is of course with the exception of the Lakhdaria section, which still requires rehabilitation work to be carried out. The repairs are expected to carry on until May or June 2016. Contractors from all over the world have been involved in the East-West highway project but certain stretches
September 9, 2015 Read time: 2 mins
The long running saga of Algeria’s East-West Highway should come to a key point soon, when most of the route will finally be open to traffic. The 1,216km-long route will be fully operational at the end of October 2015. This is of course with the exception of the Lakhdaria section, which still requires rehabilitation work to be carried out. The repairs are expected to carry on until May or June 2016. Contractors from all over the world have been involved in the East-West highway project but certain stretches built by Chinese, South Korean and Japanese firms have suffered delays as well as quality issues. These have been the subject of official scrutiny and not all the legal cases have yet been resolved. As part of the commissioning, the national agency of motorways ANA and the motorway management agency AGA will merge into the Algerian motorway agency ADA, the Ministry of Public Works has revealed.

Related Content

  • Boom in African road construction projects
    February 22, 2012
    Huge investments are being made in major road construction projects for North Africa. The biggest is the 'Autoroute Transmaghrébine' highway, which is also Africa's largest ever road construction project. Once complete, the highway will connect the Maghreb states of Morocco, Algeria, Tunisia and Libya and will have a total length of 3,200km.
  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.
  • Work commencing on a new highway in Algeria
    July 8, 2014
    Work is now underway on Algeria’s new 62km highway in Batna. The project was opened officially by the Algerian president. The US$567 million project will connect with Algeria’s key East-West highway and forms part of the president's 2005-2025 programme of works. The first section of the new highway will be split into two lots, linking the provinces of Batna, Khenchela and Oum El Bouaghi.
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th