Skip to main content

Algeria bypass project underway

Work is now underway on a series of projects in Algeria, including the East West Highway and a key highway bypass. The 67km Khémis Miliana-Berrouaghia bypass is expected to cost around US$836 million, with work due for completion at the end of 2016. The project is being handled by an Algerian/Italian team.
December 1, 2015 Read time: 2 mins
Work is now underway on a series of projects in Algeria, including the East West Highway and a key highway bypass. The 67km Khémis Miliana-Berrouaghia bypass is expected to cost around US$836 million, with work due for completion at the end of 2016. The project is being handled by an Algerian/Italian team.

The Djebel El Ouahch bypass is now open to traffic. This forms part of the important East-West highway. The 30km stretch between Didouche-Mourad and Ain Bouziane (Skikda) has also been opened. The Djebel El Ouahch bypass, cost $73.86 million and will improve traffic flow in the city of Constantine. The Algerian Government is keen to complete the last 84km section of the East West highway. This section of the route is located in the country’s El Tarf region. Works have been delayed due to a disagreement between the national motorway agency ANA and the Cojaal consortium. The government has stressed that works will be completed with or without Cojaal.

Work is also being carried out on a 520km section of the Blida à El Menea (Ghardaïa) North-South highway. Work will be carried out on the remaining 300km at a later date. The work is currently being carried out between Chiffa and Ghardaïa.

Plans are in hand to widen the RN1 road connecting Ghardaïa and El Meneaa. Upgrading and modernising this route will also include adding measures to prevent flooding, a frequent problem at present. The study for the works is being handled by a specialist based in Oran.

And construction of the Ouargla 10km bypass is around 65% complete at present, with the work due for completion in April 2016. The first 3km stretch of the road is expected to be operational as early as January 2016. The construction of the bypass has experienced delays due to the need for the relocation of electrical cabling and the protection of existing pipelines.

Related Content

  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River
  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c
  • California highway upgrade underway
    October 27, 2020
    Upgrade work is now underway for an important California highway route.
  • Hungarian bypass contract for STRABAG
    September 14, 2021
    STRABAG has been awarded a major Hungarian bypass contract.