Skip to main content

Albania tunnel construction completed

Albania’s Ministry of Transportation has announced that the northern part of the Thirre Tunnel on the Rreshen-Kalimash Highway is due for completion in October. The 170km motorway linking Albania and Kosovo is estimated to be worth €1 billion although the real costs have not been officially revealed.
May 14, 2012 Read time: 1 min
Albania’s Ministry of Transportation has announced that the northern part of the Thirre Tunnel on the Rreshen-Kalimash Highway is due for completion in October.

The 170km motorway linking Albania and Kosovo is estimated to be worth €1 billion although the real costs have not been officially revealed.

It is the single largest public project in Albania's history.

Related Content

  • Karpaty Tunnel value-for-money scrutinised
    May 19, 2023
    The planned 12km Karpaty Tunnel under the Lesser Carpathian mounts of Slovakia is again being questioned as the government awaits an environmental impact assessment.
  • Poland's highway projects benefit from EU funds
    May 15, 2012
    Since 1990 loans worth a total of €10 billion have been granted by the EIB for Polish road projects, with some 20% of the loans going to private companies. During 2010, the EIB will be lending some €2.79 billion for Polish road projects.
  • Algeria tunnel project nearly complete
    June 9, 2016
    Work on a major tunnel project in Algeria is due for completion shortly. The tunnel will commence carrying traffic during July 2016, although an official inauguration date has not so far been announced. The T4 tunnel will connect Constantine with Skikda and Annaba, which lie to the north and on Algeria’s coast. The 2.5km tunnel forms a section of the East-West highway. To cope with the tricky geological conditions in the area, both umbrella arch and composite roof bolting methods have been used to sup
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th