Skip to main content

A1 Upgrade section opens in the UK

A key section of the UK’s important A1 route is now open to traffic.
March 27, 2019 Read time: 2 mins

A key section of the UK’s important A1 route is now open to traffic. The 5.6km stretch of the A1 in Cambridgeshire has been widened from two to three lanes in each direction. This work forms part of 8100 Highways England’s £1.5 billion project to upgrade the A14.

The busy A1 carries around 31,000 vehicles/day along this stretch. Highways England is upgrading 34km of the A14, the east of England’s major trunk road, between Cambridge and Huntingdon. The improvements include creating seamless links between the A14 and the A1, with a redesigned junction and widening of the A1 either side of it.

The improvements the A14 scheme is delivering will boost the local and national economy, upgrade a key link between the east coast and the midlands and save up to 20 minutes for the 85,000 drivers/day who use it. A

The project will deliver a continuous motorway from London to Peterborough for the first time.

The A14 Cambridge to Huntingdon project is now more than half way through construction. Nine of the project’s 34 bridges and structures have already opened to traffic and the longest one, the half-mile long River Great Ouse Viaduct, was completed in February. The team has worked hard to protect and enhance the natural environment, and made incredible archaeological discoveries including a 100,00-year-old woolly mammoth tusk and woolly rhino skull, and more recently the earliest evidence of beer brewing in Britain, dating back to 400BC.

The A14 project is due to be completed and fully opened by December 2020.

For more information on companies in this article

Related Content

  • UK's M25 junction works planned
    May 25, 2022
    The UK government is planning two contracts on London’s orbital M25 motorway.
  • Road maintenance deal commencing in the UK
    June 8, 2021
    Amey’s road maintenance deal is now commencing in the UK.
  • Expressways upgrades for key UK routes
    December 15, 2017
    Key routes in England are to be upgraded as part of a programme of works worth a mighty €33.9 billion (£30 billion) plan from 2020 to 2025. This five year plan from Highways England will see many of the major A road routes being reclassified as A(M) expressways. These will resemble motorways in many respects, with new on and off ramps and additional lanes being constructed. The A14 stretch between Cambridge and Huntingdon will be one of the first stretches to be upgraded in such a fashion. This is an
  • Mobile Visual Information Systems’s DATEX on the A14 in the UK
    November 7, 2017
    Highways England has deployed an intelligent transport system that uses portable message signs to display real-time journey information from the National Traffic Operations Centre (NTOC). Mobile Visual Information Systems’s DATEX allows an average of 85,000 drivers daily on a 34km section of the A14 Cambridge-to-Huntingdon upgrade scheme to navigate roadworks. The scheme includes a new bypass, junction improvements, highway widening and creation of access road. The A14 Integrated Delivery Team, on behalf