Skip to main content

19th century Newhall Road Bridge gets 21st century makeover

A Sheffield bridge with a history dating back to the 17th century has been strengthened, repaired and restored by Amey. Newhall Road bridge over the River Don is one of 240 road bridges and culverts in Sheffield to be given a new lease of life thanks to investment linked to Sheffield City’s €2.5 billion Streets Ahead highway maintenance contract.
April 10, 2018 Read time: 2 mins
1889 and still going: Newhall Road Bridge over the River Don in Sheffield, England
A Sheffield bridge with a history dating back to the 17th century has been strengthened, repaired and restored by 2958 Amey.


Newhall Road bridge over the River Don is one of 240 road bridges and culverts in Sheffield to be given a new lease of life thanks to investment linked to Sheffield City’s €2.5 billion Streets Ahead highway maintenance contract.

The current steel structure was built around 1889 close to the location of the giant Hecla Works where manganese steel was developed. But the crossing’s history can be traced back several centuries to a time when it was a rural bridge for a packhouse, a warehouse used for curing tobacco or storing produce.

The five-month scheme was carried out Amey and tackled areas of corrosion to some of the steel structural elements as well as overall strengthening, explained Christopher Hampson, Amey structures manager.

“Although the bridge was perfectly functional, parts of the original steel trusses and a steel troughing underneath were corroded, partly as a result of its environment and road salts over the years.

“We carried out a large number of repairs to the steelwork. A number of the original rivets were replaced with new bolts, a new concrete slab was cast on the deck and it was fully resurfaced. The bridge was completely re-painted and the stonework restored.


“It was time consuming work because it is only once you have started that you discover extra areas that require attention. Now completed, the life of the bridge has been extended by many years,” said Hampson.

The government-backed Streets Ahead programme will help Sheffield improve roads, footpaths, street lighting and other highways infrastructure.

Amey will have strengthened 40 road bridges including other historic bridges that will allow the lifting of weight restrictions. With the main five-year core investment programme almost completed, Amey will carry out regular routine and preventative maintenance to all the city’s highway structures over the next 20 years.

For more information on companies in this article

Related Content

  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Bentley Systems is growing its portfolio of engineering solutions
    January 15, 2020
    New software advances from Bentley Systems as well as partnerships with Siemens and Topcon offer benefits for asset maintenance – Mike Woof writes
  • CET opens new laboratory to service UK’s infrastructure projects
    October 23, 2017
    With over £300 billion of investment in infrastructure planned over the next four years in the UK, materials testing firm CET is gearing up to service a lot more projects – Kristina Smith visited the newest laboratory near Heathrow to find out more. The CET Group has ambitious plans. Over the next four years it wants to double the size of its business, which in the last year turned over £27 million. “There’s a lot of positivity out there,” said Gary Corrigan, managing director of the group’s infrastructu