Skip to main content

Tunnel ventilation systems provide fresh air

Elta Fans supplied specialist ventilation fans for the A3 Hindhead Tunnel in Surrey, UK which opened in July this year.
February 15, 2012 Read time: 1 min
Fans from elta provide fresh air into the uK's new Hindhead tunnel

Elta Fans supplied specialist ventilaton fans for the A3 Hindhead Tunnel in Surrey, UK which opened in July this year.

The A3, which previously ran around the Devil's Punch Bowl, a local beauty spot, now runs right under it in a 2km tunnel built by main contractor 1146 Balfour Beatty.

Ventilation contractor James Paget Services installed two sets of long-cased axial fans from Elta with matching stainless steel ancillaries to ventilate the void in the low-point sump. Each fan works for 12 hours, switches to standby for 12 hours, and then operates in the opposite direction.

The order also included four bifurcated, cylindrically cased ATEX axial fans with matching ancillaries. The bifurcated fans have been developed for handling hostile conditions of hot, dust-laden air, corrosive fumes or gases and are designed so that the gases bypass the motor.

For more information on companies in this article

Related Content

  • Hamburg-Finkenwerder airport has new runway surface
    August 21, 2013
    Hamburg’s Finkenwerder airport is now benefiting from a new runway surface following work carried out by contractor KEMNA BAU. The company recently used machines from Dynapac to resurface 36,000m2 of the runway track in Hamburg-Finkenwerder, a facility used by Airbus. The airport handles around 10-15 take-offs and landings/day when aircraft are either undergoing flight testing or being delivered to customers, as well as for deliveries of components by transport aircraft. The project was tricky as the
  • The side effect – paving with a road widener
    December 13, 2018
    Sidewinder UK has been using its novel road widener machines on a series of paving jobs, including smart motorway projects. Sidewinder UK has carried out work on the M6 smart motorway contract between junction 16 and junction 19. The company used one of its road wideners to place and grade the final layer of sub-base to the balanced central reservation in readiness for Tarmac Contracting to pave the base and binder courses. An estimated 5,000tonnes of sub-base was used in the initial 6.4km x 4.7m wide st
  • Key innovations in engines and drivelines technology at Conexpo 2014
    April 22, 2014
    Engines and drivelines technologies have move forward, as could be seen at Conexpo 2014 - Geoff Ascroft reports Solutions for Tier 4 Final emissions regulations dominated Conexpo 2014, with many firms showing off their options of DOC, DPF and SCR after-treatments. Deutz, while staying with an SCR-only solution, took a more unusual approach on its high horsepower V6 12litre and V8 16litre engines. Both get a dual SCR after treatment system to meet Tier 4 Final emission standards. Using a dual SCR system,
  • Lighting innovations boosting brightness, cutting costs
    January 27, 2014
    CU Phosco’s new P850 LED main road lantern has just seen its first major deployment – between Junctions 16 and 17 of the A55, a strategic road which skirts the North Wales coastline – Jason Barnes reports The A55 is a grade-separated dual carriageway also known as the North Wales Expressway. Some 139km long, it originally ran from Chester to Bangor but was extended across the Isle of Anglesey into Holyhead Docks in 2001 under a project part-funded by the European Union.