Skip to main content

Tunnel inspections reveal safety compliance need

Results show the state of Europe's tunnel infrastructure at its 'most sublime and most depressing quality' as Patrick Smith reports. EuroTAP [European Tunnel Assessment Programme] 2010 has unveiled the results of inspections conducted earlier this year in 26 major tunnels in 13 European countries. The on site inspections, carried out between 12 April and 20 May, 2010, are said to indicate that an "alarming number of operational tunnels across Europe will not be ready to comply with EU tunnel safety rules wh
May 9, 2012 Read time: 4 mins
The double-deck Duplex A86 tunnel near Paris, opened in 2009, gained a glowing report. (EuroTAP, Jan Potente, photographer)

Results show the state of Europe's tunnel infrastructure at its 'most sublime and most depressing quality' as Patrick Smith reports.

2436 EuroTAP [European Tunnel Assessment Programme] 2010 has unveiled the results of inspections conducted earlier this year in 26 major tunnels in 13 European countries. The on site inspections, carried out between 12 April and 20 May, 2010, are said to indicate that an "alarming number of operational tunnels across Europe will not be ready to comply with EU tunnel safety rules when they come into effect in 2014." Of the tunnels (four in Spain, three in Germany, Italy, Austria and Switzerland, two in France and Norway, one in Belgium, Croatia, the Netherlands, Slovenia, the Czech Republic, and for the first time in the history of EuroTAP, in Iceland), overall one was rated as poor, three as very poor, two as acceptable, four as good and 16 tunnels scored very good.

The EU Tunnel Directive setting the minimum safety requirements for tunnels in the trans-European road networks was adopted in 2004.

EuroTAP says that despite significant progress made by many tunnel operators, practically 40% of tunnels tested in EuroTAP 2010 did not score top marks.

"We can see indications that some Member States will have an obvious problem to comply with the deadlines set by the EU Tunnel Directive by 2014 and 2019 respectively," said Wil Botman, director general of the FIA [7115 Fédération Internationale de l’Automobile, the organisation of the world's leading motoring organisations] European Bureau. "It is necessary to speed up the process of refurbishment of tunnels already in operation in order to meet requirements of the Directive and to improve the safety of all motorists." EuroTAP claims that inadequate breathing equipment for fire fighters, a major shortcoming in half of all tunnels would make rescues in thick smoke impossible. Similarly, the frequently noted lack of tunnel loudspeakers makes warnings about accidents to drivers entering or already in the tunnel impossible. Missing hydrants and information displays at portals, no barriers to close the tunnel, dark tunnel walls and insufficient escape route signs were among the most common deficiencies, while 19% of tunnels lack appropriate lighting and in-tunnel traffic radio reception, conditions all motorists expect to function.

With motorisation across Europe expected to increase and not just in peak holiday periods, roads and tunnels will have to bear increasing daily volumes of vehicles and increased risks of accidents.

"This year's results show the state of Europe's tunnel infrastructure at its most sublime and most depressing quality. In last place out of the 26 tested tunnels is Iceland's [sub-sea] Hvalfjörður Tunnel. For this EU candidate country, EuroTAP can serve as a benchmark in its efforts to become an EU member and comply with EU legislation," says EuroTAP.

The Hvalfjördur Tunnel, on the south-west coast of Iceland, opened in 1998, reduced the travel distance between the capital Reykjavík and other localities by over 40km.

Plans for the future include (2010) improved markings for lay-bys; additional fire extinguishers and batteries for the uninterruptible power supply system to be supplemented/replaced. Next year additional video cameras and transmission via optical fibres; additional emergency phones with fire extinguishers and improved markings are planned, while in 2012 escape route signs in the tunnel and new cabling for evacuation lighting will be fitted.

Between 2012 and 2014 the installation of an automatic video surveillance system; an automatic extinguishing system in the transformer stations and certified cables for power supply and control are scheduled.

With traffic in the tunnel increasing by approximately 10-12%/year 2004-2007, it was felt a new tunnel was necessary in 2014-2015 but following the financial crisis in 2008, there has been no growth in traffic.

"All geological research and primary design for the new tunnel was ready in July, 2008 but now it is not on the plan in the public sector for the next 8-10 years," said Gylfi Thordarson, managing director of the tunnel operators Spölur ehf.

At the other end of the test results scale stands the state-of-the-art A86 Duplex Tunnel, part of a ring road around Paris. This exemplary and innovative double-deck tunnel with cross-connections and additional escape and rescue routes every 200m, offers the full range of safety features that other operators should target.

For more information on companies in this article

Related Content

  • India’s road to safety
    September 5, 2012
    India's growth rate is the envy of the world, and its infrastructure is rapidly improving, but its road safety record is the world's worst. Patrick Smith reports on a conference aimed at finding answers to the problems Ambling through the gardens and marble magnificence that is the Taj Mahal or gazing down on the city of Jaipur from the hilltop Jaigarh Fort is far removed from the world outside.
  • Focusing on workzone safety systems
    March 16, 2012
    The US has seen a major reduction in deaths following accidents in its highway construction work zones, while Europe and other parts of the world are looking at new safety technology and systems to trigger a similar trend. Guy Woodford reports. Work in the US to reduce the likelihood of potentially fatal accidents at highway work zones is paying dividend.
  • Road pricing could boost UK road investment
    July 4, 2012
    UK road users receive a mere £4 billion in capital investment, and congestion increases. Road pricing could provide the roads needed and reduce taxes, says a new report UK motorists receive a "paltry" £4 billion (€5 billion) investment in road capacity in return for the €57.5 billion a year they contribute in road user taxes, according to the 2008/9 Road File, published by the UK Road Users Alliance (RUA). Over the last decade, this infrastructure spend has led to a minimal 1% increase in the road network t
  • ERF sets out sign inspection guidelines
    December 27, 2024
    The European Union Road Federation suggests that its checklist - downloadable for free - is included in any existing tools for road safety inspection and audits that road agencies may have.