Skip to main content

Tunnel inspections reveal safety compliance need

Results show the state of Europe's tunnel infrastructure at its 'most sublime and most depressing quality' as Patrick Smith reports. EuroTAP [European Tunnel Assessment Programme] 2010 has unveiled the results of inspections conducted earlier this year in 26 major tunnels in 13 European countries. The on site inspections, carried out between 12 April and 20 May, 2010, are said to indicate that an "alarming number of operational tunnels across Europe will not be ready to comply with EU tunnel safety rules wh
May 9, 2012 Read time: 4 mins
The double-deck Duplex A86 tunnel near Paris, opened in 2009, gained a glowing report. (EuroTAP, Jan Potente, photographer)

Results show the state of Europe's tunnel infrastructure at its 'most sublime and most depressing quality' as Patrick Smith reports.

2436 EuroTAP [European Tunnel Assessment Programme] 2010 has unveiled the results of inspections conducted earlier this year in 26 major tunnels in 13 European countries. The on site inspections, carried out between 12 April and 20 May, 2010, are said to indicate that an "alarming number of operational tunnels across Europe will not be ready to comply with EU tunnel safety rules when they come into effect in 2014." Of the tunnels (four in Spain, three in Germany, Italy, Austria and Switzerland, two in France and Norway, one in Belgium, Croatia, the Netherlands, Slovenia, the Czech Republic, and for the first time in the history of EuroTAP, in Iceland), overall one was rated as poor, three as very poor, two as acceptable, four as good and 16 tunnels scored very good.

The EU Tunnel Directive setting the minimum safety requirements for tunnels in the trans-European road networks was adopted in 2004.

EuroTAP says that despite significant progress made by many tunnel operators, practically 40% of tunnels tested in EuroTAP 2010 did not score top marks.

"We can see indications that some Member States will have an obvious problem to comply with the deadlines set by the EU Tunnel Directive by 2014 and 2019 respectively," said Wil Botman, director general of the FIA [7115 Fédération Internationale de l’Automobile, the organisation of the world's leading motoring organisations] European Bureau. "It is necessary to speed up the process of refurbishment of tunnels already in operation in order to meet requirements of the Directive and to improve the safety of all motorists." EuroTAP claims that inadequate breathing equipment for fire fighters, a major shortcoming in half of all tunnels would make rescues in thick smoke impossible. Similarly, the frequently noted lack of tunnel loudspeakers makes warnings about accidents to drivers entering or already in the tunnel impossible. Missing hydrants and information displays at portals, no barriers to close the tunnel, dark tunnel walls and insufficient escape route signs were among the most common deficiencies, while 19% of tunnels lack appropriate lighting and in-tunnel traffic radio reception, conditions all motorists expect to function.

With motorisation across Europe expected to increase and not just in peak holiday periods, roads and tunnels will have to bear increasing daily volumes of vehicles and increased risks of accidents.

"This year's results show the state of Europe's tunnel infrastructure at its most sublime and most depressing quality. In last place out of the 26 tested tunnels is Iceland's [sub-sea] Hvalfjörður Tunnel. For this EU candidate country, EuroTAP can serve as a benchmark in its efforts to become an EU member and comply with EU legislation," says EuroTAP.

The Hvalfjördur Tunnel, on the south-west coast of Iceland, opened in 1998, reduced the travel distance between the capital Reykjavík and other localities by over 40km.

Plans for the future include (2010) improved markings for lay-bys; additional fire extinguishers and batteries for the uninterruptible power supply system to be supplemented/replaced. Next year additional video cameras and transmission via optical fibres; additional emergency phones with fire extinguishers and improved markings are planned, while in 2012 escape route signs in the tunnel and new cabling for evacuation lighting will be fitted.

Between 2012 and 2014 the installation of an automatic video surveillance system; an automatic extinguishing system in the transformer stations and certified cables for power supply and control are scheduled.

With traffic in the tunnel increasing by approximately 10-12%/year 2004-2007, it was felt a new tunnel was necessary in 2014-2015 but following the financial crisis in 2008, there has been no growth in traffic.

"All geological research and primary design for the new tunnel was ready in July, 2008 but now it is not on the plan in the public sector for the next 8-10 years," said Gylfi Thordarson, managing director of the tunnel operators Spölur ehf.

At the other end of the test results scale stands the state-of-the-art A86 Duplex Tunnel, part of a ring road around Paris. This exemplary and innovative double-deck tunnel with cross-connections and additional escape and rescue routes every 200m, offers the full range of safety features that other operators should target.

For more information on companies in this article

Related Content

  • Europe’s road safety is not improving as previously
    April 3, 2012
    The latest official figures on road safety in Europe are giving cause for concern, with data showing casualty reduction has slowed. EU Transport Commissioner Siim Kallas recently announced a disappointing progress on casualty reduction on Europe's roads. The joint European police association, TISPOL, has added that it is also concerned that improvements in cutting fatalities on Europe’s roads significantly slowed in 2011.
  • “It’s road maintenance stupid,” MEP Michael Cramer tells pavement preservation and recycling summit PPRS Paris 2015
    February 23, 2015
    Road owners around the world “need a highway to heaven” according to Michael Cramer MEP, chairman of the European Parliament transport committee. Speaking at PPRS Paris 2015, the pavement preservation and recycling summit, Cramer said that Europe’s current road policy “lies somewhere between AC/DC’s Highway to Hell and Led Zeppelin’s Stairway to Heaven” and that, to mis-quote Bill Clinton, the EU needs to start thinking “it’s road maintenance stupid” whenever the subject of highway investment is under consi
  • Safety measures aid workzone accident reduction
    February 20, 2012
    Everyone connected with the highway industry is involved in the efforts to cut down the number of work zone accidents. Patrick Smith reports. A few months ago, as road work resumed on America's highways and bridges, US Transportation Secretary Ray LaHood called on drivers to use extra caution in work zones. At the same time he commended the success in reducing overall roadway fatalities in each of the last seven years.
  • Make the case for electronic tolling, ASECAP conference delegates heard
    September 14, 2015
    Mobility pricing and electronic tolling is the future, delegates to a recent ASECAP Study Days conference, reports Geoff Hadwick at the Lisbon event. The international road tolling industry is failing to make its case and the sector is losing out to other social and political lobby groups. As a result, “tolling is still on the sidelines”, according to the head of the Washington-based International Bridge, Tunnel and Turnpike Association. IBTTA chief executive Pat Jones issued his stark warning at the