Skip to main content

Stirling Lloyd in the fast lane: Waterproofing Warsaw’s Rowecki Bridge

Warsaw’s General Stefan Rowecki Bridge, or the Grota Bridge, is the second largest in the Polish capital and, as part of the Trasa Toruska expressway, it is the busiest. The structure, which opened in 1981, handles 150,000 cars daily, so repairs were always going to be tricky if minimal disruption to traffic was to occur. The steel orthotropic deck consists of two structurally independent parts – each with four traffic lanes. This meant that pedestrians and cyclists were restricted to two very narrow track
January 19, 2016 Read time: 4 mins
Colour contract made quality inspections easier
Warsaw’s General Stefan Rowecki Bridge, or the Grota Bridge, is the second largest in the Polish capital and, as part of the Trasa Toruska expressway, it is the busiest

The structure, which opened in 1981, handles 150,000 cars daily, so repairs were always going to be tricky if minimal disruption to traffic was to occur.  The steel orthotropic deck consists of two structurally independent parts – each with four traffic lanes. This meant that pedestrians and cyclists were restricted to two very narrow tracks, each separated from the road by traffic barriers, which made the bridge inaccessible to many people.

As a result, repair work to the bridge included widening to incorporate an extra two lanes in each direction for through-traffic, three lanes for local traffic and separate cycle and pedestrian paths.

Extreme weather conditions dictated that a high level of protection was needed. It was also important to ensure minimum maintenance in the future. Also, part of the bridge had to remain open during the work, to minimise traffic disruption.

Contractor B7 did reconstruction work on the 645m long x 40m wide bridge, while ZBM Inwestor Zastpczy was the lead engineering firm. They found that, once exposed, the deck had many irregularities including protrusions from the steel mesh.

After trialling several waterproofing solutions from different suppliers on the uneven deck profile, the contractors selected 2314 Stirling Lloyd’s Eliminator system, said Ned Birley, export general manager at Stirling Lloyd Polychem.

Stirling Lloyd’s authorised contractor, DWD Service prepared the deck and applied the waterproofing coat in phases based around reconstruction work.

The first phase was applying the Eliminator system to the pedestrian areas in July 2014. The second phase – consisting of waterproofing the main and new deck – was completed between April and June this year.

For both phases, the deck was prepared by shot-blasting metallic grit, followed by an independent assessment of the work that included measurement of the surface profile, dust assessment and ionic contamination. This was essential to ensure a strong bond between the substrate and the waterproofing, vital to the long-term performance of any membrane.

Adhesion pull-off tests confirmed a bond of between 3MPa and 4 MPa, more than the specified 2 MPa.

The Eliminator system comprised an initial anti-corrosive primer, ZED S94, to protect the newly exposed steel deck and enhance the bond between the deck and membrane. Once this had dried, the Eliminator system was sprayed on in two coats of contrasting colour – aiding on-site quality control and helping to ensure complete waterproofing integrity.

A final Tack Coat No. 2 was then applied. The thin film ‘hot melt’ adhesive ensures a strong bond between the membrane and surface. This adhesion between the deck, Eliminator and surfacing enables all elements to act as a composite, particularly important on a busy orthotropic steel deck. In turn, this helps to extend the life of both the surfacing and the structure. DWD was able to apply 1000m2 of the full bridge deck waterproofing system per day and which dried in less than an hour.

“Service and application conditions for the waterproofing were also extreme,” said Marcin Szwed, technical manager at Stirling Lloyd Polychem.

“Due to the phased nature of the work, the waterproofing system was applied and exposed to hot and cold weather conditions, with the deck temperature reaching up to 70°C at its peak. Using a system that can be applied in a wide range of temperatures and climatic conditions means that waterproofing installation can be carried out throughout the year, an essential feature for a large, phased project.”

Stirling Lloyd recently announced that Eliminator has gained European Technical Assessment (ETA) certification from the European Organisation for Technical Approvals (EOTA) through the British Board of Agrément (BBA). The ETA is based on the testing requirements in the  European Technical Approval Guideline (ETAG) 033. Eliminator is the first UK manufactured system to achieve this level of accreditation.

For more information on companies in this article

Related Content

  • New bridge refurbishment solutions now available
    July 15, 2015
    An array of new bridge refurbishment and repair solutions are available – Mike Woof writes Around the world there are many bridges requiring repairs or refurbishment, and there is a ready market for novel solutions to upgrade existing structures. New developments offer quicker and more efficient ways to improve bridge surfaces and structural performance and add new life to ageing designs. Spancrete is broadening the availability of its novel precast building solutions worldwide by offering these to th
  • Tunnel essential to reduce congestion
    February 21, 2012
    Vietnam's Ho Chi Minh City's dense population, which was estimated to be 10,680 persons/km2 in 2005, is, over the next ten years, set to benefit from the completion of the Thu Thiem Urban Area project, which will provide homes for up to 200,000 people.
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.
  • Sprayed tunnel waterproofing reduces build costs
    February 10, 2012
    Sprayed waterproofing: 'hot topic' Sprayed waterproofing is a hot industry topic, and a paper presented at the recent North American Tunnelling Conference not only discussed this method for achieving a dry tunnel but also how it can reduce build costs and construction time.