Skip to main content

Silk Road: 'viable alternative'

The final results of the International Road Transport Union's (IRU) New Eurasian Land Transport Initiative (NELTI)-Phase 2 have confirmed road trade links between Europe and Asia as an economically-attractive and viable alternative to traditional, saturated maritime trading routes.
February 17, 2012 Read time: 3 mins
The final results of the 1203 International Road Transport Union's (IRU) New Eurasian Land Transport Initiative (NELTI)-Phase 2 have confirmed road trade links between Europe and Asia as an economically-attractive and viable alternative to traditional, saturated maritime trading routes.

This was unveiled at the recent 6th IRU Euro-Asian Road Transport Conference and Ministerial Meeting held in Tbilisi, the Georgian capital, which concluded that removing the remaining procedural impediments at borders and developing the necessary auxiliary infrastructure is essential to realise the significant growth potential of such international road trade flows.

Launched in June, 2009, in close cooperation with the 943 Asian Development Bank (ADB) and its Central Asian Regional Economic Cooperation programme (CAREC), the IRU's NELTI-Phase 2 monitored regular commercial deliveries over two years, performed by road transport companies from 13 European and Asian countries, including China, and covering 18 states spanning the Eurasian landmass along five routes (Northern, Central, Southern, Afghan and Chinese).

The average cargo movement speed along NELTI-2 routes was 18.4km/hour, which is equivalent to approximately 450km/day.

"The numerous stops on the way, for both justified (fuel refills, meals, rest and road traffic regulations) and unwarranted reasons (border waiting times, extensive vehicle and cargo controls and customs clearance), explain this relatively low speed," says the organisation.

However, the analysis of drivers' logbook data highlighted that downtime at borders results in a daily loss of 280km not being driven, which means that almost 40% of road transport time along the Silk Road is lost at borders due to inappropriate border crossing procedures which impede trade growth along the entire Eurasian landmass.

Meanwhile, the Economic Cooperation Organisation Regular Monitoring of Trucks (ECO-RMT) in partnership with IRU's NELTI-3 has been launched in Ashgabat, the Turkmenistan capital, at the 8th Meeting of the Ministers of Transport and Communications of the ECO member states.

ECO secretary general, Mohammed Yahya Maroofi, explained: "Reliable, factual information about the conditions of international road transport in the ECO region is crucial to identify real impediments and appropriate solutions to be implemented in order to effectively remove or reduce physical and non-physical barriers to international road transport." This is the aim of the ECO-RMT, which will collect invaluable data on border waiting times, customs procedures, controls and roadside checks as well as existing transport infrastructure along major transport routes in our region." This joint ECO RMT/NELTI-3 project, a continuation of the ECO-IRU Silk Road Truck Caravan 2010 and IRU's NELTI 1 and 2, will allow the collection and analysis of data on the current conditions of international road transport faced by professional truck drivers during international commercial cargo deliveries in the ECO region through special questionnaires and logbooks to be filled by drivers of 26 participating companies from seven ECO member states, (Azerbaijan, Kazakhstan, Kyrgyzstan, Iran, Tajikistan, Turkey and Turkmenistan) applying the UNESCAP Time-Distance-Cost methodology [a simple way of illustrating the time and costs involved in the transportation process].

For more information on companies in this article

Related Content

  • Tajikistan road project funding package
    June 18, 2018
    Funding is being secured for a road rebuild and widening project in Tajikistan. The 82km road runs between Dushanbe and Bokhtar and the work should be complete by 2023. The Chinese contractor Xinjiang Beixin is working on phase 1 of the project, building a 33km stretch of the route that is costing US$96 million. Phase 2 of the project is for a 40km section of the route, with construction due to start in the second half of 2018. The phase 2 construction work will be financed by $90 million of funding being s
  • A new transportation project for Northern Southeast Asia
    March 2, 2022
    Transport in Northern Southeast Asia is to benefit from a new US$145 million project
  • Georgia's Rikoti Pass upgrades to finish in 2023
    November 19, 2021
    Widening work on the E-60 highway into four lanes has been ongoing for several years.
  • G&Z pave the way as East meets West
    March 28, 2014
    The Silk Route is one of the oldest trading links between Europe and Asia and is being upgraded with some of the newest equipment. The nation of Georgia is located on what is known as the ‘crossroads’ between Western Asia and Eastern Europe. It lies to the east of the Black Sea and is on one of the shortest routes between western China and Europe. Since the Middle Ages this strategically important country has played host to one of the network of roads collectively known as the Silk Route. For much of the 20