Skip to main content

Project underway for Chinese bridge

Potain tower cranes are being used to construct a major cable-stayed bridge in China. The conditions are tough and feature high winds and monsoon conditions, with the cranes working at an altitude of 1,500m above sea level in a mountain range in southern China to build the Duge Beipanjiang Bridge, which will span 720m when it is complete The job is requiring six Potain tower cranes in total during the course of the US$92.75 million (570 million RMB) project. Two cranes have been erected at the job site a
May 15, 2014 Read time: 3 mins
The cranes are having to contend with tough operating conditions
Potain tower cranes are being used to construct a major cable-stayed bridge in China. The conditions are tough and feature high winds and monsoon conditions, with the cranes working at an altitude of 1,500m above sea level in a mountain range in southern China to build the Duge Beipanjiang Bridge, which will Span 720m when it is complete

The job is requiring six 5916 Potain tower cranes in Total during the course of the US$92.75 million (570 million RMB) project. Two cranes have been erected at the job site and are working on the bridge’s main pylons on either side of the Beipanjiang Canyon. The four other Potain cranes are due to be installed over the coming months and all of the cranes will work at the site for four years. The cranes will climb to final working heights of up to 290m to complete the project.
Liupanshui Shengsheng Construction Equipment Leasing owns the Potain MCT 370 cranes. The Potain cranes at the Duge Beipanjiang Bridge project were transported more than 2,000km from Potain’s facility in Zhangjiagang, Jiangsu province, to the job site, much of it along narrow and winding roads. Now, the equipment has to cope with the monsoon climate, which fluctuates from freezing temperatures, high winds and snow through to drought and dust storms. Operations for the cranes run 14 hours a day, every day, with both required to lift construction materials and equipment in loads of up to 20tonnes. The bridge’s pylons will measure 269m and 247m in height, so to contend with such high lifting heights the cranes are fitted with winches that enable them to lift 17tonne loads up to 270m high.

The Potain MCT 370 is built at Potain’s facility in Zhangjiagang, Jiangsu province, China. The maximum jib length is 75m while 2.7tonnes can be lifted at the jib end. The MCT 370 has a maximum free-standing height of more than 64m.

Duge Beipanjiang Bridge will Span across the Beipanjiang Canyon at the boundary of Yunnan Province and Guizhou Province. Total length for the bridge will be 1,340m and having started in 2012, work is expected to complete in 2016. Main contractor in charge of the build is Second Harbour Engineering Company, a subsidiary of the Fortune 500-listed 2661 China Communications Construction Company. In addition to the bridge the company is building a 3.4km section of the Bidu Expressway, which includes three tunnels and seven bridges.

For more information on companies in this article

Related Content

  • Hitachi Sumitomo’s European launch of new SCX1500A-3 hydraulic crawler crane
    January 6, 2017
    Hitachi Sumitomo Heavy Industries Construction Crane Company (HSC) says its new 150tonne capacity SCX1500A-3 hydraulic crane, being unveiled at bauma, has features to enhance its sustainability, mobility, performance and safety. Said to be suitable for construction, material handling and civil engineering applications, the SCX1500A-3 has been manufactured to comply with Stage IIIB emission regulations. Equipped with a powerful new-generation 210kW Isuzu engine, the sustainability of the 150tonne x4.5m lifti
  • Hitachi Sumitomo’s European launch of new SCX1500A-3 hydraulic crawler crane
    February 11, 2013
    Hitachi Sumitomo Heavy Industries Construction Crane Company (HSC) says its new 150tonne capacity SCX1500A-3 hydraulic crane, being unveiled at bauma, has features to enhance its sustainability, mobility, performance and safety. Said to be suitable for construction, material handling and civil engineering applications, the SCX1500A-3 has been manufactured to comply with Stage IIIB emission regulations. Equipped with a powerful new-generation 210kW Isuzu engine, the sustainability of the 150tonne x4.5m lifti
  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • High mobility for Sennebogen’s new crane
    April 10, 2018
    Sennebogen says that its new 670 HD crane offers a maximum 70tonne lift capacity as well as ease of transport and versatility. The heavy duty crane features a lattice boom and is part of the firm’s E-series, having been designed for use in demanding applications and with a wide variety of equipment. Customers have a choice of three engine variants, a 298kW Tier 3/Stage IIIa version and either 261kW or 321kW diesels that meet Tier 4 Final/Stage IV requirements. According to Sennebogen, the machine can be us