Skip to main content

Project underway for Chinese bridge

Potain tower cranes are being used to construct a major cable-stayed bridge in China. The conditions are tough and feature high winds and monsoon conditions, with the cranes working at an altitude of 1,500m above sea level in a mountain range in southern China to build the Duge Beipanjiang Bridge, which will span 720m when it is complete The job is requiring six Potain tower cranes in total during the course of the US$92.75 million (570 million RMB) project. Two cranes have been erected at the job site a
May 15, 2014 Read time: 3 mins
The cranes are having to contend with tough operating conditions
Potain tower cranes are being used to construct a major cable-stayed bridge in China. The conditions are tough and feature high winds and monsoon conditions, with the cranes working at an altitude of 1,500m above sea level in a mountain range in southern China to build the Duge Beipanjiang Bridge, which will Span 720m when it is complete

The job is requiring six 5916 Potain tower cranes in Total during the course of the US$92.75 million (570 million RMB) project. Two cranes have been erected at the job site and are working on the bridge’s main pylons on either side of the Beipanjiang Canyon. The four other Potain cranes are due to be installed over the coming months and all of the cranes will work at the site for four years. The cranes will climb to final working heights of up to 290m to complete the project.
Liupanshui Shengsheng Construction Equipment Leasing owns the Potain MCT 370 cranes. The Potain cranes at the Duge Beipanjiang Bridge project were transported more than 2,000km from Potain’s facility in Zhangjiagang, Jiangsu province, to the job site, much of it along narrow and winding roads. Now, the equipment has to cope with the monsoon climate, which fluctuates from freezing temperatures, high winds and snow through to drought and dust storms. Operations for the cranes run 14 hours a day, every day, with both required to lift construction materials and equipment in loads of up to 20tonnes. The bridge’s pylons will measure 269m and 247m in height, so to contend with such high lifting heights the cranes are fitted with winches that enable them to lift 17tonne loads up to 270m high.

The Potain MCT 370 is built at Potain’s facility in Zhangjiagang, Jiangsu province, China. The maximum jib length is 75m while 2.7tonnes can be lifted at the jib end. The MCT 370 has a maximum free-standing height of more than 64m.

Duge Beipanjiang Bridge will Span across the Beipanjiang Canyon at the boundary of Yunnan Province and Guizhou Province. Total length for the bridge will be 1,340m and having started in 2012, work is expected to complete in 2016. Main contractor in charge of the build is Second Harbour Engineering Company, a subsidiary of the Fortune 500-listed 2661 China Communications Construction Company. In addition to the bridge the company is building a 3.4km section of the Bidu Expressway, which includes three tunnels and seven bridges.

For more information on companies in this article

Related Content

  • A Hardanger to follow
    June 13, 2012
    Two MDT 128 topless cranes from Potain are said to be playing a crucial role in the construction of the Hardanger Bridge in Norway - set to be one of the longest suspension bridges in the world. The 6tonne cranes are placing suspension cables, and making other lifts, at the top of one of the bridge’s pylons, where working heights exceed 200metres. The cranes are owned by Ajos, a leading crane rental company and the Potain dealer for Denmark. Ajos supplied the cranes to MT Hojgaard, one of the largest cont
  • New bridge under construction in Turkey
    March 28, 2014
    Work is underway on a new bridge structure in Turkey, with tower cranes playing a key role in the project The two Potain tower cranes are being used to build a 610m long cable-stayed bridge in the south-east of the country. The two cranes are MC235B models and are working 10 hours/day on the project, which is taking 30 months. The new bridge will provide an important connection across the Ataturk Dam Reservoir on the Euphrates River.
  • New coastal highway route for Reunion
    July 15, 2016
    Work on a new €1.7 billion coastal road is underway around France’s Reunion Island This new 12.3km highway (Route du Littoral) will have three lanes in each direction when it is complete in 2018. The new offshore highway connects Saint Denis, the administrative capital of La Réunion, with La Possession.
  • Kuwait parking site job for Potain crane
    April 16, 2018
    NFT, one of the world's leading tower crane suppliers, continues to enjoy regional growth in the Middle East. The company has boosted its market presence in Kuwait with a number of deliveries to major projects in the country. One of the most significant has seen the first Potain self-erecting cranes enter the country. The customer, Nasser Al Hajri & Partners Company, bought an Igo T 130 and an Igo 50. NFT also won its first ever contract with local construction giant Combined Group Contracting (CGC). The