Skip to main content

Peruvian highway has highest tunnel

A new tunnel connection is helping boost connectivity in Peru, improving access to remote areas Building the tunnel has been an important project as Peru has an imbalance in population distribution with 54.6% of its inhabitants concentrated in the areas along the Pacific Ocean, while only 32% of the population lives in the Andes highlands and 13.4% in the Amazon tropical jungles. The imbalance is acute given that the tropical jungle areas account for 60% of the country’s national territory. Economic deve
October 2, 2014 Read time: 3 mins
Ventilation in the tunnel portal has helped during construction
A new tunnel connection is helping boost connectivity in Peru, improving access to remote areas

Building the tunnel has been an important project as Peru has an imbalance in population distribution with 54.6% of its inhabitants concentrated in the areas along the Pacific Ocean, while only 32% of the population lives in the Andes highlands and 13.4% in the Amazon tropical jungles. The imbalance is acute given that the tropical jungle areas account for 60% of the country’s national territory. Economic development also reflects this disequilibrium, due to a concentration of economic activity in the national capital. The city of Lima and its metropolitan area is home to 29% of Peru’s population.

The country has benefited from strong economic growth during the last 18 years, some of the best economic growth indexes in all of South America; however, the transport infrastructure has not grown as rapidly as the economy. The region of Ancash, located in the north-west of the country, provides a key example. Ancash has suffered poor transport without a highway connecting it with the interior of the country, which would allow it to export its products internationally through the border with Brazil.

However the new highway running from Carhuaz-Chacas-San Luis is of strategic importance to improve transportation for this region. It will not only permit an increase in exports of locally produced products, but will also open new areas to tourism. For the latter, the route of the new highway runs past snow-capped mountain peaks and over 20 lakes in the Conchucos area, a short distance from the Huascaron Mountain Peak. This new highway will make a significant reduction in journey times for local inhabitants, who currently require 8-9 hours to make the trip between Carhuaz and Chacas, but will see this slashed to 2½ hours. The new road will go through the new Punta Olimpica Tunnel. The shorter distance will lower running costs for vehicles and promote development of agricultural production in the area. The Carhuaz-Chacas-San Luis highway, which runs for 100km, will have a 44km section that traverses the Huascaron National Park and improve the lives of over 300,000 people in the surrounding area.
The road starts at the outskirts of Carhuaz, some 2,647m above sea level and ends in the town of San Luis at an altitude of 3,051m above sea level. The route follows the existing road called “Callejon de Huaylas” (Huaylas Alley) up to 49km, where it runs into the highest road tunnel in the world.

The Punta Olimpica Tunnel lies at an altitude of 4,738m above sea level. It has a total length of 1,380m and has been constructed in particularly challenging conditions. The altitude places high stress levels on equipment as the thin air means diesel engines and electric motors are more prone to overheating and cannot be loaded as heavily as at lower altitudes. For internal combustion engines in particular, the altitude also affects combustion and turbocharging and they have to be specially configured for working at height. Similar stresses have been placed on the personnel and winter conditions can be particularly tough at this altitude.

Related Content

  • Bechtel and Enka win highway contract for Kosovo
    July 2, 2014
    Bechtel and its joint-venture partner Enka have won a contract to build a 60km highway connecting Kosovo’s capital Pristina with neighbouring Macedonia. The new Route 6 highway will help improve Kosovo’s transport links, a highly important factor for the future economic development of this small, landlocked nation. Bechtel-Enka previously constructed Kosovo’s Route 7 highway, which was completed in November 2013, a whole year ahead of schedule. The Route 7 highway with Morina on the Albanian border through
  • Ethiopia races on with projects
    June 13, 2012
    Ethiopia is pursuing a 10-year $2.4 billion development plan, part of which are ambitious road developments. Shem Oirere reports Ethiopia is hastening its pace towards accessing a share of the East Africa commodity market and opening itself up for foreign investment through the implementation of an ambitious road development strategy, the Road Sector Development Programme (RSDP). The landlocked nation has convinced a number of international lenders of the viability of RSDP, with some of them now loosening
  • Increased infrastructure spending
    February 22, 2012
    With economies booming in the BRIC countries and other regions, spending on infrastructure is at a high - Patrick Smith reports As economic crisis grips much of the world, many countries are still spending billions on infrastructure to improve transportation. While the USA and Europe struggle with debt problems (and this has affected much of the rest of the world) the development of highways, airport, ports and other infrastructure is gathering pace in other regions to boost economic developments.
  • Danish-German Fehmarn Belt road and rail tunnel hits funding snag
    July 9, 2015
    A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18