Skip to main content

Paso de las Leña tunnel between Argentina and Chile

A new tunnel between Chile and Argentina will boost trade and transport between the two countries - Mauro Nogarin writes The international Tunnel Paso Las Leñas will stretch 11.5km at 2,050m above sea level through the Andes. Once complete, it will greatly improve the connectivity and integration between the Chilean O'Higgins region with the Argentine Mendoza region.
December 22, 2016 Read time: 3 mins
Because of the altitude, the weather conditions can be challenging

A new tunnel between Chile and Argentina will boost trade and transport between the two countries - Mauro Nogarin writes

The international Tunnel Paso Las Leñas will stretch 11.5km at 2,050m above sea level through the Andes. Once complete, it will greatly improve the connectivity and integration between the Chilean O'Higgins region with the Argentine Mendoza region. It will provide an additional road infrastructure to help the integration between Chile, Mercosur and Asia through the axis from Porto Alegre-Buenos Aires-San Luis-San Rafael to San Antonio Rancagua-Santiago-Valparaiso. Also included in this project is the construction and paving of an international road measuring 134km, from Sosneado, in Argentina, to the area of the Termas de Cauquenes, connecting from there with Route 5 and the Camino de la Fruta.

The works will represent an investment of US$1.67 billion, split between Chile and Argentina. This sum also includes the improvement and maintenance of roads, construction and equipping of the tunnel and the construction of buildings for border control.

Paso de las Leña tunnel
Total estimated length: 11.6km
Chile side:    2.6km (22.5%)
Argentine side: 9km (77.5%)
Tunnel entrance altitude in Chile: 2,020m
Tunnel entrance altitude in Argentina: 2,364m
Average grade: 3%

The expected benefit is to boost Argentina's integration with the other countries of the Mercosur group - Brazil, Paraguay, Uruguay and Venezuela. Associate countries are Bolivia, Chile, Peru, Colombia, Ecuador and Suriname. The project will also shorten the route  between Santiago and Buenos Aires by 50km; reduce transportation costs; and improve the development of foreign trade in mining, farming, forestry and industrial products.

From a geomorphological point of view the area of the tunnel is in an area of transverse  cords that descend from the mountains forming small river valleys draining from the Andes. However, the main challenge for this project is the climate, which produces avalanches during the winter and floods in spring. Communications are often severely disrupted for at least one month a year which could affect the project’s progress.

The tunnel construction project Las Lenas also includes improving access to the tunnel from both sides of the Andes. On the Chilean side, the Ministry of Public Works will build and improve a total of 57.7km of roads. In fact, in July 2016 the engineering study for the stretch of 11km began between the Cauquenes and Chacayes sector. The Cortaderal river valley has a length of 20.8km to the entrance to the tunnel portal and is characterised by major earthworks and road structures such as bridges and viaducts.

The construction of the double tunnels, each with two lanes, has a total length of 11.6km, with 2.6km on the Chilean side and 9km in Argentina. It is designed with an average gradient of 3% and will be at just over 2,040m above sea level in parallel to Rancagua, Chile, and San Rafael in Argentina.

Each tunnel is 7.3m wide, with a 1m pedestrian walkway on each side and a height of 5.1m. At the top of the tunnel it has a double chamber for exhaust air and at the bottom a double chamber for fresh air of 7.3m wide.

Currently the method of excavation NATM is being used and it was decided not to use a TBM due to the rigidity in the design of the geometry of the cross section and the radii of curvature of alignment.

Additional studies have focused on a ventilation system and fire emergencies, cost-benefit analysis of energy supply and seismic risk.

Related Content

  • Agua Negra tunnel between Chile and Argentina
    May 15, 2014
    The current Paso de Agua Negra is the highest border crossing between Chile and Argentina. On the Argentine side, the Agua Negra Pass is located at 4,765m above sea level and 260km from the city of San Juan in the province of San Juan in the north-west of the country. On the Chilean side, the pass lies 229km from the city of La Serena in the Coquimbo region. The pass can be accessed from the Argentine side via National Highway No 150 from the province of La Rioja, which runs for a total of 390km. From the C
  • Border crossing boost for Chile and Argentina
    February 24, 2012
    The authorities in Chile and Argentina are discussing upgrades that can be made to several border crossings between the two countries.
  • Agreement between Chile and Argentina on tunnel route
    January 21, 2013
    The authorities in Chile and Argentina have signed a key agreement over the Agua Negra Tunnel project. This new tunnel will provide a new link between the two countries. The link is expected to feature a twin tube design and will connect the Argentinian province of San Juan and the Chilean IV Region of Coquimbo. The tunnel will form a crucial component in the Mercosur route. The new tunnel will be in the vicinity of the current Paso de Agua Negra border crossing. When it is complete, the planned Mercosur ro
  • Chile’s road development work continues
    February 6, 2018
    Chile’s ambitious road development programme is continuing. Work is starting on the Americo Vespucio Oriente (AVO 1) highway project. This is expected to cost US$926 million and will provide an improved connection from the El Salto area to Principe de Gales. The work should be completed in the second half of 2021. However a number of complaints have been made with regard to the project, which could delay the timeframe once more. The project was originally due to open for traffic in 2020. Meanwhile Chile’s