Skip to main content

New tunnelling technology saves time

New tunnelling technology from BASF has helped cut construction time on a major tunnel project in Australia. The system has been used to speed waterproofing, an important point as the link runs underneath one of Australia's major rivers. The spray-applied polymer membrane provided by a BASF sprayed concrete machine saved time and effort on the construction of the Clem Jones 7 Tunnel (Clem 7) in Brisbane, Australia. The 4.8km tunnel was completed seven months ahead of schedule and at its lowest point Clem 7
February 15, 2012 Read time: 2 mins
New spraying technology from BASF is offering advances in tunnelling sealing performance

New tunnelling technology from BASF has helped cut construction time on a major tunnel project in Australia.

The system has been used to speed waterproofing, an important point as the link runs underneath one of Australia's major rivers. The spray-applied polymer membrane provided by a 2645 BASF sprayed concrete machine saved time and effort on the construction of the Clem Jones 7 Tunnel (Clem 7) in Brisbane, Australia.

The 4.8km tunnel was completed seven months ahead of schedule and at its lowest point Clem 7 runs some 70m below sea level. While the original specification of a traditional sheet membrane system was initially used, the installation of the sheet system proved time-consuming.

A membrane system with a fast rate of application was required because the delays were hampering the fast-track construction program.

The project's engineers needed to find a replacement waterproofing solution that was quick and easy to apply. The solution was a sprayapplied polymer membrane from BASF Construction Chemicals, MASTERSEAL 345. Once trained in the application of the product, it was possible for the LBBJV crew to apply up to 2,000m²/day of membrane. The product was applied with one of BASF's 2646 MEYCO Piccola dry-mix sprayed concrete machines.

MASTERSEAL 345 is a singlecomponent spray-applied powder product, which bonds layers of sprayed or cast concrete. When mixed with water at the nozzle and delivered to the substrate via compressed air, it provides a tough, elastic membrane layer. The flowable nature of the freshly applied product ensures all irregularities in the porous profile of the tunnel wall are coated evenly, providing a positive waterproof seal.

Over 68,000m² of the product was applied in various sections of the project, supplying the contractor with the quickly applied, high quality waterproofing option required.

Clem 7 comprises twin road tunnels, excavated using two 12.4m diameter TBMs and 10 roadheaders, to link the Brisbane suburbs of Woolloongabba in the south to Bowen Hills in the north. Extensive surface works were required to tie the tunnels into the existing road network at six portal locations. The tunnel was designed to ease inner-city congestion.

For more information on companies in this article

Related Content

  • Spanish contractor Sorigué has the edge with VÖGELE SprayJet
    March 21, 2016
    Spanish contractor Sorigué, the first to use the SUPER 1800-3i SprayJet from Vögele, has pioneered paving thin overlays and the development of new mixes. The company won the contract for rehabilitating the surface course of the 3km-long dam, 10m-wide promenade in the Catalonian port city of Tarragona. Sorigué’s idea was to overlay the existing surfacing with a thin layer applied to a spray seal of polymer-modified bitumen. The spray seal prevents water penetrating inside the structure – a major advant
  • BAUER involved in constructing a tunnel under the Suez Canal
    October 4, 2016
    The widened Suez Canal, located at Ismailia in Egypt, is now providing extra capacity for vessels, having been officially opened in August 2015. The waterway has great significance for world trade and has been widened at certain points and also expanded.
  • Cost effective road maintenance
    February 8, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports. Road maintenance is an increasingly important industry that spans a worldwide market. Awareness of the need for a stable and sustainable international infrastructure, maintenance and creative rural road technologies are taking a stronger role as viable sources for a cost-effective means of preserving, developing and prolonging the life of roads wit
  • Qatar tunnel project benefits from sophisticated formwork
    March 7, 2018
    A sophisticated formwork solution has played an important part in the construction of a new road and rail tunnel in Qatar in the Middle East. The formwork system was supplied by ULMA, which supplied its equipment for the construction of the Lusail Boulevard Tunnel in Qatar. The new tunnel provides access to the new Lusail City Development, from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tournament. The overall Lusail City Development, located 15km north of Do