Skip to main content

New tunnel connection for Mexico

A major tunnel construction project has been carried out in Mexico, setting a technological precedent for Latin America . Mexican materials giant CEMEX took part in the construction of the Coatzacoalcos Underwater Tunnel in Veracruz, Mexico. This innovative project features large tunnel bores and utilised a complex construction process. As a result of these technical challenges CEMEX was required to design and deliver special concretes so as to allow the construction of the different structures needed to
November 8, 2017 Read time: 3 mins
The new tunnel sets a precedent for Latin America

A major tunnel construction project has been carried out in Mexico, setting a technological precedent for Latin America

Mexican materials giant 3016 CEMEX took part in the construction of the Coatzacoalcos Underwater Tunnel in Veracruz, Mexico. This innovative project features large tunnel bores and utilised a complex construction process. As a result of these technical challenges CEMEX was required to design and deliver special concretes so as to allow the construction of the different structures needed to provide the tunnel and profile as well as for the portals.

Because the route of the tunnel runs under water the company managing the project, Constructora Túnel de Coatzacoalcos, asked CEMEX to deliver specific concrete solutions for the different structural elements and the agents to which they would be exposed. “Through its quality department, CEMEX worked with us to design the concrete mix used in the tunnel to meet the durability requirements specified by the needs of this project and international standards,” explained Darwin Hernandez, technical manager for the construction project.

CEMEX supplied 48,000m3 of special products, from concrete for the different structural elements to the design and placement of concrete pavement inside the tunnel and the toll area. CEMEX supplied concrete in separate massive pouring of 600m3 and 800m3 for the slabs of the access ramps to the tunnel.

“CEMEX offered its know-how and ability to solve construction challenges. Additionally, it followed up very closely with both the needs prior to the design of the project and the concrete formulations to proceed with the castings,” added Jose Armengol Notario, production superintendent of Producción de Constructora Túnel de Coatzacoalcos.

The chosen construction method was developed in the Netherlands and was selected as it provided the least impact on urban areas. The technique utilised large prefabricated reinforced concrete modules that were produced in a dry dock and then transported to the site for installation under water. For this project, five concrete blocks were built in a dry dock on the banks of the Coatzacoalcos River and later transferred and placed at the bottom of the river.

The tunnel features four traffic lanes in all, with two in each direction, and is expected to ease traffic congestion between the Coatzacoalcos urban area and the petrochemical industrial area of Villa Allende. Its effect on congestion is expected to be significant, reducing commuting times from 30 minutes to just three minutes.

For more information on companies in this article

Related Content

  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul