Skip to main content

New bridge to replace old

Neckarauer overpass, a railroad bridge adjacent to the plant of German paving equipment manufacturer Vögele, is one of Mannheim's main traffic arteries. Built in 1936, the overpass represents an important link into the city for commuters coming from the south of the Rhine-Neckar region being used by some 60,000 vehicles/day, together with several tram lines running every five minutes. Corrosion has caused heavy damage to the steel girder bridge, and recently a 30km/hour speed limit has been in place along w
July 24, 2012 Read time: 2 mins
The Vögele SUPER 800 placed some 80tonnes of asphalt mix for the bridge access areas

Neckarauer overpass, a railroad bridge adjacent to the plant of German paving equipment manufacturer 1194 Vögele, is one of Mannheim's main traffic arteries.

Built in 1936, the overpass represents an important link into the city for commuters coming from the south of the Rhine-Neckar region being used by some 60,000 vehicles/day, together with several tram lines running every five minutes.

Corrosion has caused heavy damage to the steel girder bridge, and recently a 30km/hour speed limit has been in place along with a ban on vehicles over 16tonnes.

Planning for a new bridge has been finalised, but an important objective is to keep the Neckarau overpass open to traffic during the period scheduled for building the new structure.

In mid-2007, construction work for a provisional bridge began next to the old one. Part of this bridge reaches into the land of 364 Wirtgen Group company Joseph Vögele.

Construction company Achatz, as a local partner of the contractors for the New Neckarau Overpass, was awarded the contract to build the access areas for the bridge, carrying out asphalt surfacing and installing the tramway tracks.

 For asphalt paving, the company used a Vögele SUPER 800 and placed some 80tonnes of asphalt mix for the wearing course. Combined with an AB 200 Extending Screed in TV version, the small paver was said to be the ideal candidate for the job.

For more information on companies in this article

Related Content

  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • New US pavers coming to market
    June 21, 2016
    Key developments are being seen in the market for US pavers, with new models being introduced by several key manufacturers - Mike Woof writes An array of new US-style paver models is now being made available on the market. Several of the main manufacturers have developed updated paver models, with new low emission engines being amongst the key upgrades being fitted. Atlas Copco has new Dynapac pavers available in the shape of its F800T tracked machine as well as the F1000T tracked and F1000W wheeled
  • BOMAG: road construction with warm mix asphalt
    July 3, 2024
    When it comes to paving and compacting warm mix asphalt (WMA), BOMAG rollers and pavers really come into their own. Well prepared for what’s to come: road construction with warm mix asphalt.
  • Asphalt paving is seeing innovative new technology
    April 4, 2013
    With new machines coming to market, the asphalt paving sector is seeing an array of sophisticated technology now available