Skip to main content

New bridge to replace old

Neckarauer overpass, a railroad bridge adjacent to the plant of German paving equipment manufacturer Vögele, is one of Mannheim's main traffic arteries. Built in 1936, the overpass represents an important link into the city for commuters coming from the south of the Rhine-Neckar region being used by some 60,000 vehicles/day, together with several tram lines running every five minutes. Corrosion has caused heavy damage to the steel girder bridge, and recently a 30km/hour speed limit has been in place along w
July 24, 2012 Read time: 2 mins
The Vögele SUPER 800 placed some 80tonnes of asphalt mix for the bridge access areas

Neckarauer overpass, a railroad bridge adjacent to the plant of German paving equipment manufacturer 1194 Vögele, is one of Mannheim's main traffic arteries.

Built in 1936, the overpass represents an important link into the city for commuters coming from the south of the Rhine-Neckar region being used by some 60,000 vehicles/day, together with several tram lines running every five minutes.

Corrosion has caused heavy damage to the steel girder bridge, and recently a 30km/hour speed limit has been in place along with a ban on vehicles over 16tonnes.

Planning for a new bridge has been finalised, but an important objective is to keep the Neckarau overpass open to traffic during the period scheduled for building the new structure.

In mid-2007, construction work for a provisional bridge began next to the old one. Part of this bridge reaches into the land of 364 Wirtgen Group company Joseph Vögele.

Construction company Achatz, as a local partner of the contractors for the New Neckarau Overpass, was awarded the contract to build the access areas for the bridge, carrying out asphalt surfacing and installing the tramway tracks.

 For asphalt paving, the company used a Vögele SUPER 800 and placed some 80tonnes of asphalt mix for the wearing course. Combined with an AB 200 Extending Screed in TV version, the small paver was said to be the ideal candidate for the job.

For more information on companies in this article

Related Content

  • All aboard Wirtgen’s Czech express
    June 17, 2021
    Wirtgen’s paving train: two SP 154(i) slipform pavers and the TCM 180(i) texture curing machine rehabilitate the D1 between Prague and Brno.
  • On track with Cat Mobil-trac
    June 20, 2024
    A UK contractor is making good use of its latest Cat Mobil-trac paver for urban resurfacing work.
  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac
  • In the fast lane
    May 14, 2012
    More than 500 million people worldwide watched the first Formula 1 motor race in India's history. The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company Vögele (a member of the Wirtgen Group).