Skip to main content

New bridge to replace old

Neckarauer overpass, a railroad bridge adjacent to the plant of German paving equipment manufacturer Vögele, is one of Mannheim's main traffic arteries. Built in 1936, the overpass represents an important link into the city for commuters coming from the south of the Rhine-Neckar region being used by some 60,000 vehicles/day, together with several tram lines running every five minutes. Corrosion has caused heavy damage to the steel girder bridge, and recently a 30km/hour speed limit has been in place along w
July 24, 2012 Read time: 2 mins
The Vögele SUPER 800 placed some 80tonnes of asphalt mix for the bridge access areas

Neckarauer overpass, a railroad bridge adjacent to the plant of German paving equipment manufacturer 1194 Vögele, is one of Mannheim's main traffic arteries.

Built in 1936, the overpass represents an important link into the city for commuters coming from the south of the Rhine-Neckar region being used by some 60,000 vehicles/day, together with several tram lines running every five minutes.

Corrosion has caused heavy damage to the steel girder bridge, and recently a 30km/hour speed limit has been in place along with a ban on vehicles over 16tonnes.

Planning for a new bridge has been finalised, but an important objective is to keep the Neckarau overpass open to traffic during the period scheduled for building the new structure.

In mid-2007, construction work for a provisional bridge began next to the old one. Part of this bridge reaches into the land of 364 Wirtgen Group company Joseph Vögele.

Construction company Achatz, as a local partner of the contractors for the New Neckarau Overpass, was awarded the contract to build the access areas for the bridge, carrying out asphalt surfacing and installing the tramway tracks.

 For asphalt paving, the company used a Vögele SUPER 800 and placed some 80tonnes of asphalt mix for the wearing course. Combined with an AB 200 Extending Screed in TV version, the small paver was said to be the ideal candidate for the job.

For more information on companies in this article

Related Content

  • Vögele Super Dash 3 pavers deliver productivity gains
    March 9, 2017
    Vögele has unveiled two Dash 3 generation asphalt pavers at the CONEXPO-CON/AGG show – the Super 1700-3i and the Super 2000-3i. Both of these tracked machines can also be specified as wheeled pavers, the Super 1703-3i and the Super 2003-3i respectively.
  • Smart road surfacing in a tunnel
    August 19, 2022
    Smart road construction techniques have been used in the widest tunnel in Switzerland. Efficient operation and logistics were required for paving a width of 11.5m in the Gubrist Tunnel and contractor Marti AG Solothurn Bauunternehmung made good use of Vögele’s WITOS Paving Plus technology to optimise its work on the project.
  • Advances in asphalt paving equipment coming to market
    June 27, 2018
    Some of the key manufacturers are improving asphalt paving technology with key developments to machines as well as the electronics and telematics systems fitted – Mike Woof writes. Several of the major asphalt paver manufacturers have unveiled new machines and systems that can optimise operations. Improved operating features for the BOMAG BF 800 C-2 paver are said to help increase its output and efficiency when working on-site. An important development is the new traffic light system, which helps improve co
  • Rural Czech roads get paving upgrade
    November 2, 2012
    A series of rural road rebuilds have improved transport connections in the Czech Republic, helping to boost connectivity and the local economy The roads around Brandýs nad Labem, some 25km to the southwest of Czech capital Prague are crucial arteries to the rural and agricultural areas of the country. An assessment by regional authorities indicated that these roads are in need of repair. That led to cold planing and paving work on a series of rural roads near Brandýs nad Labem. The regional authorities had