Skip to main content

New bridge to replace old

Neckarauer overpass, a railroad bridge adjacent to the plant of German paving equipment manufacturer Vögele, is one of Mannheim's main traffic arteries. Built in 1936, the overpass represents an important link into the city for commuters coming from the south of the Rhine-Neckar region being used by some 60,000 vehicles/day, together with several tram lines running every five minutes. Corrosion has caused heavy damage to the steel girder bridge, and recently a 30km/hour speed limit has been in place along w
July 24, 2012 Read time: 2 mins
The Vögele SUPER 800 placed some 80tonnes of asphalt mix for the bridge access areas

Neckarauer overpass, a railroad bridge adjacent to the plant of German paving equipment manufacturer 1194 Vögele, is one of Mannheim's main traffic arteries.

Built in 1936, the overpass represents an important link into the city for commuters coming from the south of the Rhine-Neckar region being used by some 60,000 vehicles/day, together with several tram lines running every five minutes.

Corrosion has caused heavy damage to the steel girder bridge, and recently a 30km/hour speed limit has been in place along with a ban on vehicles over 16tonnes.

Planning for a new bridge has been finalised, but an important objective is to keep the Neckarau overpass open to traffic during the period scheduled for building the new structure.

In mid-2007, construction work for a provisional bridge began next to the old one. Part of this bridge reaches into the land of 364 Wirtgen Group company Joseph Vögele.

Construction company Achatz, as a local partner of the contractors for the New Neckarau Overpass, was awarded the contract to build the access areas for the bridge, carrying out asphalt surfacing and installing the tramway tracks.

 For asphalt paving, the company used a Vögele SUPER 800 and placed some 80tonnes of asphalt mix for the wearing course. Combined with an AB 200 Extending Screed in TV version, the small paver was said to be the ideal candidate for the job.

For more information on companies in this article

Related Content

  • Innovations in asphalt surfacing will deliver improvements
    June 20, 2017
    The first few months of 2017 have seen a flurry of new model introductions in the asphalt paving sector for both European and North American paving types - Mike Woof writes. Developments are being seen in both European and North American asphalt paving machines. The latest equipment will help boost productivity and quality for asphalt paving work, while many of the new machines also offer increased versatility. Innovations in telematics meanwhile are helping to ensure that new generation asphalt pavers also
  • Paving tight corners on a racetrack
    May 12, 2021
    Vögele SUPER 1303-3i pavers have been used with great success on a challenging job site in Hemer, in Germany’s North-Rhine Westphalia. The machines were used in the construction of a new karting track. The contractor employed Vögele equipment for this project, paving tight bends over a length of 391.5m.
  • Paving lower temperature asphalt
    June 28, 2021
    Equipment from Vögele and Hamm has been used to build a carriageway with reduced-temperature asphalt in Germany. The equipment was required for paving a road tunnel in Kahrlsruhe. Tough conditions were applied to paving in the road tunnel under the Kriegsstrasse road.
  • Strong attendance points to a successful bauma China show
    December 17, 2014
    Even heavy rain showers on the first day of the bauma China exhibition in Shanghai did not dissuade the crowds packing the outside exhibition areas - Mike Woof writes Those firms exhibiting at bauma China 2014 in Shanghai benefited from a strong show that attracted a record attendance of 191,000, an increase of 6% over the 2012 event. A wide array of new equipment was on show from the 3,104 firms exhibiting, an increase of 14% from 2012. There was a strong focus on technology and new engines required for