Skip to main content

Kwikform composite bridge formwork solution

Composite bridge specialist falsework, Paraslim, from RMD Kwikform is being used to construct a viaduct and rail over-bridge in Wales. Paraslim is supporting the £35 million (US$55.7 million) A487 Porthmadog, Minffordd and Tremadog Bypass constructed by a joint venture partnership of Balfour Beatty and Jones Bros Civil Engineering UK.
February 27, 2012 Read time: 3 mins
RMD Kwikform’s Paraslim composite bridge solution used on the Porthmadog bypass viaduct

Composite bridge specialist falsework, Paraslim, from RMD Kwikform is being used to construct a viaduct and rail over-bridge in Wales.

Paraslim is supporting the £35 million (US$55.7 million) A487 Porthmadog, Minffordd and Tremadog Bypass constructed by a joint venture partnership of 1146 Balfour Beatty and 3265 Jones Bros Civil Engineering UK.

The 5.3km, two-lane bypass has eight bridge structures in total with 20 culverts. Two of the eight bridges are constructed using steel girders with a composite deck cast using Paraslim. A further three are constructed using precast beams and the remaining three are RC box and through girder structures.

With the variation of bridge construction methods and the tight programme to deliver the project in just 18 months, the selection of products to support the construction of the steel beam composite bridges was critical to stay ahead of programme.

JV structural sub-agent Steven Jones, said: “With a project of this nature you are always considering four key elements when it comes to product selection. The first and most important is the safety of workers and the use of safe equipment solutions. This is our number one focus, which supports our company-wide Zero Harm initiative. The second is cost effectiveness and quality, with the third being whether a product is truly fit for purpose. The final consideration is reliability and performance, in other words looking back at whether a product or solution has a track record of performing well on other similar projects.

“Having gone through this process and being familiar with the use of Paraslim on composite bridge work we have carried out in the past, we selected 319 RMD Kwikform to supply the equipment.”

The equipment also offered a safe access platform, complete with Ultraguard edge protection.
“For this particular job, this allows operatives to walk safely above water and, in the case of the second bridge, to work above a live tourist railway line, to clad the structure in local stone,” said Jones.

“From an operational perspective, the tight site in North Wales, which is relatively remote in terms of major infrastructure, leads to limited access for large-scale deliveries. Interfacing with the customer service team at RMD Kwikform allowed us to take advantage of its branch network and ability to time deliveries to site on a just-in-time basis.”

While the larger viaduct was cast, the smaller Welsh Highland Railway composite under-bridge was constructed using a Paraslim to span both Welsh Highland Heritage Railway and Welsh Highland Railway tracks, two very important and landmark tourist attractions for the region.

With the A487 due to be open soon, visitors to the region will be able to benefit from what is currently at peak times a very congested route.

For more information on companies in this article

Related Content

  • Steel for Loch Ba bridge
    February 6, 2012
    Allerton Steel, on behalf of R J McLeod, has fabricated the steelwork for a replacement bridge at Loch Ba on Rannoch Moor in the Highlands as part of its A82 upgrade scheme for Transport Scotland. R J McLeod is the civil contractor on the £2.2 million (E2.6 million) scheme which replaces the existing three-span reinforced concrete bridge.
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Rapid replacement of multiple bridges – the plan
    December 14, 2017
    The US State of Pennsylvania is saving itself $220 million over 10 years on a programme to replace 558 bridges with an unusual public private partnership approach - Kristina Smith writes It is called the Rapid Bridge Replacement Programme with good reason. Pennsylvania’s Department of Transport, PennDOT, wants to see no less than 558 structurally deficient bridges replaced with newly designed and constructed ones, all within four years. Using traditional forms of procurement this programme would be like