Skip to main content

Kontent Structures has it covered

Renovation on a bridge over the Rhine River in Karlsruhe, Germany, has been completed using a weather-resistant tent covering the entire length of the structure
October 15, 2021 Read time: 2 mins
Kontent Structures installed an 18.5m-wide by 335m-long tent along the entire length of a bridge over the Rhine River in Karlsruhe, Germany, for work to continue regardless of weather (image courtesy Kontent Structures)

By installing an 18.5m-wide by 335m-long tent, work continued regardless of weather conditions and in a dry and frost-free environment. Work was completed without delays.

Kontent Structures supplies temporary and permanent accommodation for events and business solutions, mostly across Europe. All its tent structures are designed and produced in-house with its 5,000m² facility in Alphen-on-the-Rhine, between Leiden and Utrecht in the Netherlands.

Kontent Structures installed an 18.5m-wide by 335m-long tent along the entire length of a bridge over the Rhine River in Karlsruhe, Germany, for work to continue regardless of weather (image courtesy Kontent Structures)
Kontent Structures installed an 18.5m-wide by 335m-long tent along the entire length of a bridge over the Rhine River in Karlsruhe, Germany, for work to continue regardless of weather (image courtesy Kontent Structures)

The tent for the Karlsruhe bridge project was made mostly of extruded aluminium profiles with steel connector parts. Kontent Structures sets up and dismantles its structures and the length of its tent systems is unlimited. The maximum free span is 40m. But this length depends on the location, period and weather conditions of the site to be covered.

All the tents, which are reusable, are water and weatherproof. The company said that before deciding on a tent system and design, it does a structural analysis according to the European EN Eurocode 1991-1: Actions on Structures. This includes wind and snow loads according to location-specific values. EN 1991-1-1 gives design guidance and actions for the structural design of buildings and civil engineering works, including densities of construction materials and stored materials, the self-weight of construction elements and imposed loads for buildings.

The company said that in the case of extremely cold weather, sandwich panels and air-filled double-layered roof covers can be used to provide insulation. A sandwich panel is any structure made of three layers - a low-density core and a thin skin-layer bonded to each side. Sandwich panels are used where a combination of high structural rigidity and low weight is required.To enhance the insulation of a tent, heating systems can be integrated into the structure to create a better working environment.

In the case of extremely cold weather, sandwich panels and air-filled double-layered roof covers can be used to provide insulation (image courtesy Kontent Structures)
In the case of extremely cold weather, sandwich panels and air-filled double-layered roof covers can be used to provide insulation (image courtesy Kontent Structures)

The company said that it is currently working on another site in Guntersdorf, a market town in Lower Austria.

Kontent Structure’s client was Strukton, a specialist construction company. Earlier this year, Strukton announced that it will build a 1.8km immersed tunnel underneath the Scheldt River as part of a ring road around Antwerp, Belgium. Strukton Immersion Projects, part of the Dutch engineering firm Strukton Civil, focuses on the floatation, transport and immersion of tunnel elements and caissons.

The company will develop eight tunnel elements for the Oosterweel connection that will connect the Expressweg (E34) near Blokkersdijk via a toll tunnel (the Oosterweeltunnel) underneath the Scheldt, connecting the Antwerp Ring Road at Merksem and Deurne.  

Related Content

  • Hamm | Self-monitoring in earthworks via Smart Doc
    April 1, 2021
    With Smart Doc, Hamm presents an app with which compaction in earthworks can be transparently documented and the result shared with third parties. The lean app was developed in close coordination with building practitioners. The focus here was on the possibility of self-monitoring when it comes to compaction in earthworks. Smart Doc also fulfils the minimum requirements of continuous compaction control (CCC). With an intuitive user interface, the app also creates added value when training new roller operators, as all relevant compaction parameters are visualised in real time on the smartphone.
  • Vögele | Sustainable road rehabilitation on the Dutch coast
    January 23, 2024
    In-place cold recycling with Wirtgen Group machines
  • Plants, performance and circularity
    January 1, 2023
    A decade of research has hit the roads in Scandinavia and the UK as Nynas launches Nypol RE, a lower-carbon PMB with a biogenic component
  • High production recycling with Wirtgen
    July 14, 2021
    High throughput of quality material can be achieved using the latest KMA 240(i) unit from Wirtgen. The firm says that this unit allows material to be processed sustainably and close to the jobsite