Skip to main content

Key Qatar tunnel waterproofing project

Technology from Stirling Lloyd is being used to waterproof the recently constructed Lusail Tunnel in Qatar. The construction of the tunnel is a major project as it forms part of a new US$30 billion integrated transportation system in Qatar. The new Lusail CP07-C-1-A Commercial Boulevard, Road A3 Troughs, Underpass and Tunnel project is designed to provide a connection from the recently established Lusail City to the heart of Doha in Qatar. The cut and cover tunnel provides fast access to the new Lusail City
May 17, 2017 Read time: 3 mins
The waterproofing system from Stirling Lloyd has now been proven on a number of tunnel projects in Qatar
Technology from Stirling Lloyd is being used to waterproof the recently constructed Lusail Tunnel in Qatar


The construction of the tunnel is a major project as it forms part of a new US$30 billion integrated transportation system in Qatar. The new 3352 Lusail CP07-C-1-A Commercial Boulevard, Road A3 Troughs, Underpass and Tunnel project is designed to provide a connection from the recently established Lusail City to the heart of Doha in Qatar. The cut and cover tunnel provides fast access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 2623 FIFA World Cup.

The tunnel is unusual in that it is designed to carry both road traffic and light rail. To ensure that it remains watertight, 2314 Stirling Lloyd’s Integritank system has been used to waterproof 77,416m2 of the new link.

The overall Lusail City Development, located 15km north of Doha, covers a 38km2 site, which includes 25,000 residential units, housing 175,000 people, all of whom will benefit from the Lusail Tunnel project. The development is set to generate significant economic diversification as it is set to strengthen Qatar’s tourism sector.

However, the construction of this new underground infrastructure faced challenging ground conditions and fast track construction programmes due to an aggressive and high water table.

Following a number of projects where un-bonded waterproofing systems had leaked on other Lusail sites, the client LREDC was focused on pushing the boundaries and performance of waterproofing to set new standards on their projects.

Past tunnel projects within 5329 Gulf Cooperation Council countries such as the UAE, including the Yas tunnel and Bainuna Street, further proved Stirling Lloyd’s capabilities to meet the specialist needs of underground waterproofing, working together with the contractor, Intertectra Qatar.

Following a consultation, Stirling Lloyd’s Integritank was requested by LREDC as it could meet the requirements and provide a watertight structure. Integritank was used as part of a fully bonded offering, including the PVC T-Lock system, a keyed preformed sheet membrane for the waterproofing of structural base slabs.


To meet tight deadlines and the challenging onsite conditions, speed and ease of application were key for the project. The fact that Integritank can be sprayed to verticals and up to 60m from the mixing head meant that no scaffolding was required when applying to the tunnel walls, greatly reducing the time required for the application and removing an unnecessary cost.

In addition, the membranes' puncture resistance and durability meant no additional protection boards or screeds were required, further saving time and money.   

Coordination between the designers, supervision consultants and authorised contractor Intertectra Qatar, as well as Stirling Lloyd’s technical input and onsite technical presence also ensured quality assurance.

Adhesion pull-off tests confirmed the strong bond achieved by the Integritank system, removing the threat of numerous leaks through water tracking. Watertightness and puncture resistance testing before backfilling also served to further reassure all parties involved of the effectiveness of the system. The same tests conducted after backfilling confirmed that the system had performed as expected and fulfilled its potential.

Stirling Lloyd claims that due to the challenging ground conditions and fast track construction programme, the fact that the Integritank material could be applied speedily to provide a fully bonded, seamless waterproofing system was crucial to the success of the project.

Forming part of a $30bn integrated transportation system, the 3352 Lusail Tunnel will ensure easy access to the new Lusail City Development.

For more information on companies in this article

Related Content

  • Innovative reinforcement for weak roads
    April 10, 2012
    An innovative solution was put forward to support slip roads on a Dutch motorway. Patrick Smith reports The 2010 opening of the A7 motorway extension on the southern ring road of the city of Sneek, The Netherlands, brings an end to local traffic misery. By using innovative Tensar Geocell Foundation Mattress technology over weak estuarine clay, MNO-Vervat Noord, the main contractor, constructed a key junction and its slip roads in weeks instead of months, with considerable cost savings. The conversion
  • Road marking system providers’ latest technology in-demand
    April 3, 2014
    The latest road marking systems from leading manufacturers are in demand in Europe, Africa, the Middle East and South America. Guy Woodford reports Ennis-Flint recently saw its Third Generation Waterborne Fast Dry Paint with low VOC applied on a Portuguese motorway by Trafiurbe and F.L Gaspar, two of the country’s leading contractors. The line marking is said to have been applied in response to demands from Portuguese authorities for higher specifications of line markings across the country’s highway net
  • Preformed tapes show the way
    February 27, 2012
    Swarco Industries, a division of Swarco America, has unveiled its new wet reflective temporary construction zone tape Director-2 WR.
  • AECOM wins major contract in Qatar
    June 19, 2013
    AECOM Technology Corporation is working on a US$148 million contract for a section of the Doha Expressway project in Qatar. The three year contract is for construction-supervision and design-review services for the Group 7 section of the Doha Expressway. This new highway will connect Al Khor and Mesaieed. The project is for a 168km stretch of highway, which will provide an important link for Doha’s new port and will also help improve the traffic flow for heavy vehicles around the city. The work will include