Skip to main content

Key Qatar tunnel waterproofing project

Technology from Stirling Lloyd is being used to waterproof the recently constructed Lusail Tunnel in Qatar. The construction of the tunnel is a major project as it forms part of a new US$30 billion integrated transportation system in Qatar. The new Lusail CP07-C-1-A Commercial Boulevard, Road A3 Troughs, Underpass and Tunnel project is designed to provide a connection from the recently established Lusail City to the heart of Doha in Qatar. The cut and cover tunnel provides fast access to the new Lusail City
May 17, 2017 Read time: 3 mins
The waterproofing system from Stirling Lloyd has now been proven on a number of tunnel projects in Qatar
Technology from Stirling Lloyd is being used to waterproof the recently constructed Lusail Tunnel in Qatar


The construction of the tunnel is a major project as it forms part of a new US$30 billion integrated transportation system in Qatar. The new 3352 Lusail CP07-C-1-A Commercial Boulevard, Road A3 Troughs, Underpass and Tunnel project is designed to provide a connection from the recently established Lusail City to the heart of Doha in Qatar. The cut and cover tunnel provides fast access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 2623 FIFA World Cup.

The tunnel is unusual in that it is designed to carry both road traffic and light rail. To ensure that it remains watertight, 2314 Stirling Lloyd’s Integritank system has been used to waterproof 77,416m2 of the new link.

The overall Lusail City Development, located 15km north of Doha, covers a 38km2 site, which includes 25,000 residential units, housing 175,000 people, all of whom will benefit from the Lusail Tunnel project. The development is set to generate significant economic diversification as it is set to strengthen Qatar’s tourism sector.

However, the construction of this new underground infrastructure faced challenging ground conditions and fast track construction programmes due to an aggressive and high water table.

Following a number of projects where un-bonded waterproofing systems had leaked on other Lusail sites, the client LREDC was focused on pushing the boundaries and performance of waterproofing to set new standards on their projects.

Past tunnel projects within 5329 Gulf Cooperation Council countries such as the UAE, including the Yas tunnel and Bainuna Street, further proved Stirling Lloyd’s capabilities to meet the specialist needs of underground waterproofing, working together with the contractor, Intertectra Qatar.

Following a consultation, Stirling Lloyd’s Integritank was requested by LREDC as it could meet the requirements and provide a watertight structure. Integritank was used as part of a fully bonded offering, including the PVC T-Lock system, a keyed preformed sheet membrane for the waterproofing of structural base slabs.


To meet tight deadlines and the challenging onsite conditions, speed and ease of application were key for the project. The fact that Integritank can be sprayed to verticals and up to 60m from the mixing head meant that no scaffolding was required when applying to the tunnel walls, greatly reducing the time required for the application and removing an unnecessary cost.

In addition, the membranes' puncture resistance and durability meant no additional protection boards or screeds were required, further saving time and money.   

Coordination between the designers, supervision consultants and authorised contractor Intertectra Qatar, as well as Stirling Lloyd’s technical input and onsite technical presence also ensured quality assurance.

Adhesion pull-off tests confirmed the strong bond achieved by the Integritank system, removing the threat of numerous leaks through water tracking. Watertightness and puncture resistance testing before backfilling also served to further reassure all parties involved of the effectiveness of the system. The same tests conducted after backfilling confirmed that the system had performed as expected and fulfilled its potential.

Stirling Lloyd claims that due to the challenging ground conditions and fast track construction programme, the fact that the Integritank material could be applied speedily to provide a fully bonded, seamless waterproofing system was crucial to the success of the project.

Forming part of a $30bn integrated transportation system, the 3352 Lusail Tunnel will ensure easy access to the new Lusail City Development.

For more information on companies in this article

Related Content

  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S
  • Traffic Medicine and Road Safety congress in Qatar
    October 7, 2015
    The 24th World ITMA Congress focussing on traffic medicine and road safety is being held in Qatar. The event will run from 16th – 18th November 2015 in Doha and will be hosted by Qatar’s National Traffic Safety Committee. The event will be held in conjunction with the World Day of Remembrance of Road Accident Victims. An exhibition and various community activities will be organised during the Congress, which is being run under the patronage of Qatar’s prime minister/minister of interior and president of the
  • Europe's roads need innovation and research
    February 28, 2012
    FEHRL's fifth SERRP is set to drive road transport into the 21st century
  • Europe's roads need innovation and research
    April 12, 2012
    FEHRL's fifth SERRP is set to drive road transport into the 21st century The Forum of European National Highway Research Laboratories (FEHRL) has published its fifth Strategic European Road Research Programme (SERPP V), which tackles the research and innovation challenges facing the European road and transport system now and in the future. Formed in 1989, FEHRL is a registered international association comprising more than 40 national research/technical centres, and its new programme reflects the techni