Skip to main content

Key Qatar tunnel waterproofing project

Technology from Stirling Lloyd is being used to waterproof the recently constructed Lusail Tunnel in Qatar. The construction of the tunnel is a major project as it forms part of a new US$30 billion integrated transportation system in Qatar. The new Lusail CP07-C-1-A Commercial Boulevard, Road A3 Troughs, Underpass and Tunnel project is designed to provide a connection from the recently established Lusail City to the heart of Doha in Qatar. The cut and cover tunnel provides fast access to the new Lusail City
May 17, 2017 Read time: 3 mins
The waterproofing system from Stirling Lloyd has now been proven on a number of tunnel projects in Qatar
Technology from Stirling Lloyd is being used to waterproof the recently constructed Lusail Tunnel in Qatar


The construction of the tunnel is a major project as it forms part of a new US$30 billion integrated transportation system in Qatar. The new 3352 Lusail CP07-C-1-A Commercial Boulevard, Road A3 Troughs, Underpass and Tunnel project is designed to provide a connection from the recently established Lusail City to the heart of Doha in Qatar. The cut and cover tunnel provides fast access to the new Lusail City Development from the heart of Doha and will be a vital transport link for the planned 2022 2623 FIFA World Cup.

The tunnel is unusual in that it is designed to carry both road traffic and light rail. To ensure that it remains watertight, 2314 Stirling Lloyd’s Integritank system has been used to waterproof 77,416m2 of the new link.

The overall Lusail City Development, located 15km north of Doha, covers a 38km2 site, which includes 25,000 residential units, housing 175,000 people, all of whom will benefit from the Lusail Tunnel project. The development is set to generate significant economic diversification as it is set to strengthen Qatar’s tourism sector.

However, the construction of this new underground infrastructure faced challenging ground conditions and fast track construction programmes due to an aggressive and high water table.

Following a number of projects where un-bonded waterproofing systems had leaked on other Lusail sites, the client LREDC was focused on pushing the boundaries and performance of waterproofing to set new standards on their projects.

Past tunnel projects within 5329 Gulf Cooperation Council countries such as the UAE, including the Yas tunnel and Bainuna Street, further proved Stirling Lloyd’s capabilities to meet the specialist needs of underground waterproofing, working together with the contractor, Intertectra Qatar.

Following a consultation, Stirling Lloyd’s Integritank was requested by LREDC as it could meet the requirements and provide a watertight structure. Integritank was used as part of a fully bonded offering, including the PVC T-Lock system, a keyed preformed sheet membrane for the waterproofing of structural base slabs.


To meet tight deadlines and the challenging onsite conditions, speed and ease of application were key for the project. The fact that Integritank can be sprayed to verticals and up to 60m from the mixing head meant that no scaffolding was required when applying to the tunnel walls, greatly reducing the time required for the application and removing an unnecessary cost.

In addition, the membranes' puncture resistance and durability meant no additional protection boards or screeds were required, further saving time and money.   

Coordination between the designers, supervision consultants and authorised contractor Intertectra Qatar, as well as Stirling Lloyd’s technical input and onsite technical presence also ensured quality assurance.

Adhesion pull-off tests confirmed the strong bond achieved by the Integritank system, removing the threat of numerous leaks through water tracking. Watertightness and puncture resistance testing before backfilling also served to further reassure all parties involved of the effectiveness of the system. The same tests conducted after backfilling confirmed that the system had performed as expected and fulfilled its potential.

Stirling Lloyd claims that due to the challenging ground conditions and fast track construction programme, the fact that the Integritank material could be applied speedily to provide a fully bonded, seamless waterproofing system was crucial to the success of the project.

Forming part of a $30bn integrated transportation system, the 3352 Lusail Tunnel will ensure easy access to the new Lusail City Development.

For more information on companies in this article

Related Content

  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • Mullum Mullum Valley untouched by progress
    July 20, 2012
    Preserving the unspoiled Mullum Mullum Valley was the major consideration when deciding to build a traffic tunnel The answer to one of the major issues facing construction of the A$2.5 billion EastLink route in Australia was simple: construct a tunnel. While it was expensive, those involved realised they had little option but to go underground to protect the environmentally sensitive Mullum Mullum Valley, an untouched area of wood and bushland in Melbourne. EastLink, the 39km toll road project on the easter
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s