Skip to main content

High speed bridge demolition minimises disruption

A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
February 16, 2012 Read time: 3 mins
Atlas Copco hydraulic equipment performed reliably during a 30 hour project to remove an old road bridge in southern Germany
A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.

The job formed part of a project for a new layout of the junction of the roads B297 and B29 close to Lorch in southern Germany. FWA Fischer Weilheim Abbruch was brought in by the Stuttgart Regional Council to demolish the old bridge carrying the B297 over the B29. The two-bay bridge structure was made of reinforced concrete and weighed 3,000 tonnes. During demolition work, damage caused to the closed section of Federal road had to be avoided at all cost.

The demolition job turned out to be difficult because the bridge not only featured a longitudinal and transverse slope, but also had a curve at a 280m radius to the horizontal. Slightly offset and some 15m below the bridge, a passage for local residents' vehicles had to be always accessible for rescue vehicles during the entire demolition period.

The only way to carry out the job was for the demolition to be undertaken during a set period when the roads could be closed, to minimise disruption and maximise safety.

Work started with the full closure of the roads, the removal of the crash barriers and the protection of the Federal road B29 using an impact bed made of material for subsequent recycling. This was followed by the demolition of the bridge carried out by the fleet of 178 Caterpillar machines consisting of a wheeled excavator and five crawler excavators equipped with hydraulic breakers and CombiCutters.

For its attachments FWA 2777 Fischer Weilheim used 161 Atlas Copco tools; a total of five model HB3000, HB4200 and HB7000 heavy hydraulic breakers which were supported by four model CC3300U, CC3300S and CC6000U CombiCutters.

As the two HB3000 hammers were breaking down the 300mm thick deck slab from above, the two CC3300U and the CC6000U CombiCutters started to reduce the bridge caps. Then the bottom chords with a cross sectional area of 4m2 of concrete were demolished by the two HB4200 hydraulic breakers and the HB 7000. Once the longitudinal reinforcements were accessible, they were cut by the CC3300S into lengths suitable for removal.

Once the entire bridge bay had been demolished, the CC6000U CombiCutter used its force and its 1.4m wide jaw to demolish the bridge abutments. The use of this large CombiCutter allowed the demolishers from Weilheim to tear down without major effort the one metre wide and heavily reinforced wing walls of the abutment. Afterwards the 7tonne hydraulic breaker was used to reduce the abutment to the ground.

According to the contractor the availability of the hydraulic tools more than met requirements. All five hydraulic attachments worked non-stop for 30 hours without problems.

Once the demolition work was complete the concrete was recycled on site for use in other road construction projects.

For more information on companies in this article

Related Content

  • Europe’s first Hyundai R1200-9 excavator debuts in Luxembourg
    December 15, 2017
    Démolition et terrassement XL Sàrl from Nidderkuer, Luxembourg, has been using the largest capacity Hyundai excavator, the R1200-9, in Luxembourg City centre. The R1200-9, which has an operating weight of 120tonnes, started in March in the city’s financial heart on the site of the soon-to-be Bank of China complex. The huge excavator is breaking reinforced concrete foundations with a 7tonne hydraulic breaker. The first task to complete is a 35m-deep, 6-storey underground parking area.
  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Atlas Copco introduces three powerful hydraulic breakers
    April 10, 2015
    Atlas Copco has boosted its breaker range with the addition of three new models. These breakers form part of the essential case-mounted (EC) range and are designed to fit 22- 49tonne carriers. The heavy range breakers are the EC 140 T, EC 150 T and EC 155 T. As with other models in this range, the new units are said to offer fast return on investment due to factors such as simplifed maintenance and operation. The firm claims that these EC breakers generate powerful forces inside a compact body while bein
  • CECE sets up new group for hydraulic attachments
    February 25, 2014
    The European Construction Equipment Committee, CECE, has broadened its portfolio with the formation of a new body. It has recently established a new product group for hydraulic attachment tools. The body serves as a communication and information platform for companies operating in this business segment, including companies such as Arden Equipment, Atlas Copco, Caterpillar, FRD, Indeco, Montabert, NPK, Okada, Sandvik, Simex, Socomec, Soosan, Tabe, Toku and VTN. The product group is chaired by Torsten Ahr,